|
|
This topic comprises 4 pages: 1 2 3 4
|
|
Author
|
Topic: AMC StoneBriar 24 Equipment
|
|
|
Randy Stankey
Film God

Posts: 6539
From: Erie, Pennsylvania
Registered: Jun 99
|
posted 08-01-2000 10:40 PM
I don't see a problem with three guys running 24 screens if it is done right.Opener comes in early to thread. I like this sometimes because people won't bug you and you can just do your work by yourself. Once all are threaded, you just have to start them. Can be done by one guy. Mid-shifter comes in at about 2pm. Just before the first round starts to end. Two guys run the place until about 6pm. Closer comes in at 6. Opener goes home. Two guys run the booth until the last show of the night starts. Mid-shifter goes home. Closer baby sits the last shows, and shuts down. Since the movies drop one at a time, any cleaning can be done as they drop. A guy who stays on top of things will often find that he has time to go out and have a quick smoke. The caveat is that you have to be good enough that no mistakes are made. Once you get behind, you could be in trouble. Breakdowns are a factor, too but that should be rare enough to be a minor concern.
| IP: Logged
|
|
Dave Cutler
Master Film Handler
Posts: 277
From: Centennial, CO
Registered: Jun 2000
|
posted 08-02-2000 08:43 AM
Gregory, more than likely the StoneBriar will have atleast 8 SDDS-8 houses. That's standard procedure for AMC. The four middle 'big' houses will all be SDDS-8 as well as the two biggest on each wing. If the house numbering is consistant, you will be looking for houses 4, 5, 11, 12, 13, 14, 20 & 21 for SDDS-8.Paul, are you sure that NONE of the screens are perforated. AMC typically installs a variety of screen in one complex. Here at BarryWoods 24 I have 3 different types of screens. There is a 2" hole in the port glass? How do they keep the projector noise from leaking into the auditorium? Running a 24+ plex with 3 shift is not that hard. I have one opener come in 1 hour before the first show to thread all 24. They start the first round alone (they are usually someone with enough experience to not have a problem). They also run the 2nd psuedo round alone (all the short movies that have that extra show time). 2nd shift starts at 4:00 and they work untill just after 10:00 when the last show starts. Closer comes in at 6:00 and closes down the building alone. If I have someone less experienced they only work the 4-10 shift untill they are up to speed. Thursday, Friday and Saturdays are a different story though. On Thursday I am in as a non-operator so I can make sure everything is built, screened and torndown. On Friday and Saturday I try and have two openers and two closers as well as the 3rd non-op person on Fri and Sat night to 'trouble shoot' (usually me).
| IP: Logged
|
|
|
|
John Pytlak
Film God

Posts: 9987
From: Rochester, NY 14650-1922
Registered: Jan 2000
|
posted 08-02-2000 09:03 AM
Why would anyone use a non-perforated screen, except for a Torus Screen, where you need to suck the screen into the compound curve? Yes, the perforations might be visible "close up" and cost a bit of light, but not being able to mount the speakers behind the screen is a real issue for sound placement.The only other issue I have heard regarding perforated screens that might give reason for an unperforated screen is "interference" with the pixel structure of Digital Cinema projectors. I recall that Harkness Hall actually had to develop a new smaller perforation to minimize interference with the pixels, known as the "MP" (mini-perforation) screen: http://www.harknesshall.com/data1.htm
------------------ John P. Pytlak, Senior Technical Specialist Worldwide Technical Services, Entertainment Imaging Eastman Kodak Company Research Labs, Building 69, Room 7419 Rochester, New York, 14650-1922 USA Tel: 716-477-5325 Fax: 716-722-7243 E-Mail: john.pytlak@kodak.com
| IP: Logged
|
|
Paul Konen
Jedi Master Film Handler

Posts: 981
From: Frisco, TX. (North of Dallas)
Registered: Jun 99
|
posted 08-02-2000 09:12 AM
I checked a couple of the screens and they were not perforated.The two inch hole has a sliding cover on it to close when not in use. I forgot about one thing. The Millenium head has a rubber type pad roller that directly contacts the image area to provide pressure to the soundhead for turning. Unlike the Christie that has an o-ring that rides on the perforation to provide sound head rotation. This could be a problem if the rubber pad is not kept free of debris.
| IP: Logged
|
|
John Pytlak
Film God

Posts: 9987
From: Rochester, NY 14650-1922
Registered: Jan 2000
|
posted 08-02-2000 09:51 AM
Paul said:"I forgot about one thing. The Millenium head has a rubber type pad roller that directly contacts the image area to provide pressure to the soundhead for turning. Unlike the Christie that has an o-ring that rides on the perforation to provide sound head rotation. This could be a problem if the rubber pad is not kept free of debris." I agree that it is very important to keep anything that contacts the image area of the film free of anything that may abrade or damage the film surface. However, in my experience, if the "rubber" is soft enough, and the roller turns freely without film slipping against it, the risk of damage is low. With age, these types of rollers may harden or develop flat spots, and should be replaced when they do. I find an excellent cleaner for these surfaces is 90+ percent isopropyl (rubbing) alcohol using a clean dampened wipe. (The "pre-moistened" alcohol wipes or pads sold to clean CRT screens and tape recorder capstans work well). Keep the alcohol (or ANY solvent) away from bearings. ------------------ John P. Pytlak, Senior Technical Specialist Worldwide Technical Services, Entertainment Imaging Eastman Kodak Company Research Labs, Building 69, Room 7419 Rochester, New York, 14650-1922 USA Tel: 716-477-5325 Fax: 716-722-7243 E-Mail: john.pytlak@kodak.com
| IP: Logged
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Jason Burroughs
Jedi Master Film Handler

Posts: 654
From: Allen, TX
Registered: Jun 99
|
posted 08-03-2000 11:43 AM
The AMC Grand 24 in Dallas was AMC's 1st ultra-megaplex, actually the first in the nation. So I would imagine that they learned quite a bit from it, although it looks like they kept the same general layout design. The largest screens are Torus, SDDS-8, DTS and Dolby Digital, with the DTS and Dolby processors being on rolling mini sound racks. The bigger auditoriums are 1, 6, 9, 12, 13, 16, 19, 24. also the 2 smallest auditoriums are equiped to handle the DTS and Dolby formats as well (#5 and 20) All sound racks consisted of Ultra Stero processors (No SR) Ultra Stero booth monitors /lamp excitors, and Crown amps in a tri-amped configuration. ALL screens were not perforated and had the highs and mids mounted above the screen and the LF and subs below the screen. 1 surround speaker on each side of the auditorium, Tiled booth floor, and open ceiling (no acoustical ceiling) with the booth essentially being the return duct for the AC/system as well. All projectors A/C were done by twist and lock connectors, so the projectors could be easilly moved if necessary. also an additional connector was installed at certian auditorums to accomodate future projectors, which was used for an interactive digial presentation ( I don't remember the name of it) where both projectors sat side by side. This was when the theatre opened and I'm sure things have changed since, to some degree.
| IP: Logged
|
|
|
|
All times are Central (GMT -6:00)
|
This topic comprises 4 pages: 1 2 3 4
|
Powered by Infopop Corporation
UBB.classicTM
6.3.1.2
The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion
and agrees to release the authors from any and all liability.
|