|
|
This topic comprises 2 pages: 1 2
|
|
Author
|
Topic: Booth Standards
|
Paul G. Thompson
The Weenie Man

Posts: 4718
From: Mount Vernon WA USA
Registered: Nov 2000
|
posted 02-18-2002 12:54 PM
There is no standard time set in our company, but the length of the task can vary from booth to booth. Here are seven factors that should be considered: 1. Operator experience. 2. Work area lighting. 3. How many previews are being added. 4. How many reels. 5. Number of reels that have to be rewound. 6. Type of platter systems being used. 7. Condition of the equipment. I am sure there are many more some others can list.
| IP: Logged
|
|
|
|
John Pytlak
Film God

Posts: 9987
From: Rochester, NY 14650-1922
Registered: Jan 2000
|
posted 02-18-2002 03:43 PM
IMHO, a full inspection would include gently feeling the edges of the print as it unwinds, and spot checking for scratches, heat damage, or perf damage. The fastest I would dare do this is about 2X projection speed. Even a brand new print entails a slight risk of having hidden damage if not fully inspected. Not fully inspecting a used print is simply foolish.  So a two hour show should take at least 60 minutes, PLUS the time of loading reels, removing and storing leaders, and splicing. I do favor doing the inspection on a rewind bench, rather than while loading the platter. The lighting is usually better, and speed and inertia easier to control if you find a problem. ------------------ John P. Pytlak, Senior Technical Specialist Worldwide Technical Services, Entertainment Imaging Research Labs, Building 69, Room 7525A Rochester, New York, 14650-1922 USA Tel: 585-477-5325 Cell: 716-781-4036 Fax: 585-722-7243 E-Mail: john.pytlak@kodak.com Web site: http://www.kodak.com/go/motion
| IP: Logged
|
|
|
|
|
|
|
|
|
|
|
|
Jeffry L. Johnson
Jedi Master Film Handler

Posts: 809
From: Cleveland, Ohio, USA
Registered: Apr 2000
|
posted 02-20-2002 12:28 PM
My personal rule of thumb is to allow 1/2 hour per screen for trailer work.Feature inspection and platter mounting takes me roughly the running time of the feature, a 120 minute print will take 2 hours. A brand new print might take a little less time. A used and splicy print will take much longer. So I would budget 2-2.5 hours for a new 120 minute print with trailers. Shipping out a print takes me about 1/2 the running time of the print. Also note that this is for dedicated print work. If I'm running a booth in addition to inspecting prints then it takes longer.
| IP: Logged
|
|
|
|
|
|
|
|
|
|
|
|
All times are Central (GMT -6:00)
|
This topic comprises 2 pages: 1 2
|
Powered by Infopop Corporation
UBB.classicTM
6.3.1.2
The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion
and agrees to release the authors from any and all liability.
|