|
|
This topic comprises 3 pages: 1 2 3
|
|
Author
|
Topic: ELR Why not?
|
|
|
John Pytlak
Film God

Posts: 9987
From: Rochester, NY 14650-1922
Registered: Jan 2000
|
posted 09-19-2000 10:11 AM
Actually, TES designed a very durable ELR and shipping case, that they presented to the Inter-Society Committee. Goldberg's design was likewise very robust.The ELRs and cases being used by Warner Bros. and New Line are from a different vendor, however. ------------------ John P. Pytlak, Senior Technical Specialist Worldwide Technical Services, Entertainment Imaging Eastman Kodak Company Research Labs, Building 69, Room 7419 Rochester, New York, 14650-1922 USA Tel: 716-477-5325 Fax: 716-722-7243 E-Mail: john.pytlak@kodak.com
| IP: Logged
|
|
|
|
John Walsh
Film God

Posts: 2490
From: Connecticut, USA, Earth, Milky Way
Registered: Oct 1999
|
posted 09-20-2000 11:27 AM
If the cues are included on 6000 foot reels, the editor still "controls" where the break will be. Hopefuly, the editor has given some thought as to where a good break(s) should be, and if the c/o marks are kept, a good projectionist (although stuck running 2000ft reels) will follow that example. There will always be people who will just cut the film any place (some do that now!) but it would be better to let the editor decide where, rather than an uncaring dope who would just cut it in the middle of a scene because his 2000ft reel is full.Is there anything wrong with just winding 3 reels onto one ELR? I mean, what if that became the "standard" delivery method? The labs would just wind three seperate 2000ft reels onto one ELR. The end of each reel would be taped down so it doesn't fly off when the end of the previous reel is reached. When making up, the operator cuts off the tail/head as usual, then keeps going. He stores the heads/tails the same way as now. When it's time to ship back the print, he just winds it onto the two ELR's. The next platter operator who gets the print has some work already done for him. If it's reels, that next operator has to put it back together (either for a 20 or 40 min reel) but he has the heads and tails to do so. The reel-running operator probably already has house reels, so he does not need the 20min reels that usually come in the cans.
| IP: Logged
|
|
|
|
John Pytlak
Film God

Posts: 9987
From: Rochester, NY 14650-1922
Registered: Jan 2000
|
posted 09-20-2000 12:18 PM
I agree with Brad. Although you could put three complete reels (including head and tail leaders) on an ELR "as is", you would not gain the advantages of eliminating the time and extra handling needed to remove the leaders, make splices, and then reattach the leaders after the run. Industry conversion to ELRs will require considerable investment by the labs, the exchanges, and the theatres, and is only justified by the reduced handling and improved quality allowed by not having to continually splice and unsplice leaders.I also agree that changeover cues should continue to be printed for those few theatres that continue to need them. Where to change reels should be the decision of the film editor, and not at the whim of the theatre. But to fully utilize the advantages of ELRs, ALL theatres need to be equipped to handle ELRs. "Dual inventories" of ELR and 2000-foot reels are impractical for the long term, and would lose the cost/quality advantage. ------------------ John P. Pytlak, Senior Technical Specialist Worldwide Technical Services, Entertainment Imaging Eastman Kodak Company Research Labs, Building 69, Room 7419 Rochester, New York, 14650-1922 USA Tel: 716-477-5325 Fax: 716-722-7243 E-Mail: john.pytlak@kodak.com
| IP: Logged
|
|
|
|
John Pytlak
Film God

Posts: 9987
From: Rochester, NY 14650-1922
Registered: Jan 2000
|
posted 09-20-2000 02:04 PM
I totally agree that holding theatres responsible for careless damage would help improve print quality. A better mechanism is needed to "catch" chronic offenders, to make them change their ways. The justification for ELRs is that they eliminate the lost frames and dirt/scratch buildup resulting from having to make and unmake the leader splices through the life of the print. And ELRs will save some time (i.e., money) by simplifying the "make-up" process. Multiply those savings by thousands of prints per week, and ELRs have a good "business case". ------------------ John P. Pytlak, Senior Technical Specialist Worldwide Technical Services, Entertainment Imaging Eastman Kodak Company Research Labs, Building 69, Room 7419 Rochester, New York, 14650-1922 USA Tel: 716-477-5325 Fax: 716-722-7243 E-Mail: john.pytlak@kodak.com
| IP: Logged
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
All times are Central (GMT -6:00)
|
This topic comprises 3 pages: 1 2 3
|
Powered by Infopop Corporation
UBB.classicTM
6.3.1.2
The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion
and agrees to release the authors from any and all liability.
|