Film-Tech Cinema Systems
Film-Tech Forum ARCHIVE


  
my profile | my password | search | faq & rules | forum home
  next oldest topic   next newest topic
» Film-Tech Forum ARCHIVE   » Operations   » Film Handlers' Forum   » Power in Lamphouse After Breakers are Cut (Page 2)

 
This topic comprises 2 pages: 1  2 
 
Author Topic: Power in Lamphouse After Breakers are Cut
David Stambaugh
Film God

Posts: 4021
From: Eugene, Oregon
Registered: Jan 2002


 - posted 03-31-2003 01:52 PM      Profile for David Stambaugh   Author's Homepage   Email David Stambaugh   Send New Private Message       Edit/Delete Post 
When I was in the Air Force Reserves at Norton AFB in San Bernardino CA, I got to work on radar sets for C-141s. I hated working on those things!!! Besides being huge and heavy, you had to use a special "grounding hook" to discharge the stored energy in them before you could work on them. I prefer not working on any electronics that use a "klystron". [Eek!] [Wink]

 |  IP: Logged

Michael Harlow
Expert Film Handler

Posts: 170
From: Faversham, Kent, UK
Registered: Jul 2002


 - posted 03-31-2003 01:56 PM      Profile for Michael Harlow   Email Michael Harlow   Send New Private Message       Edit/Delete Post 
Paul, Thanks. Yes, I thought that is what you may say.. At least you are here to tell the tale, if not laugh about it.

 |  IP: Logged

Gunnar Johansson
Expert Film Handler

Posts: 181
From: Gothenburg, Sweden
Registered: Mar 2003


 - posted 03-31-2003 02:59 PM      Profile for Gunnar Johansson   Author's Homepage   Email Gunnar Johansson   Send New Private Message       Edit/Delete Post 
Couldnīt have been too much fun trying to comb down all that hair standing on edge... [Smile]
Or maybe you cut it short because of the accident? Maybe an amendment to the no tie rule: No long hair...?
//Gunnar

 |  IP: Logged

Paul G. Thompson
The Weenie Man

Posts: 4718
From: Mount Vernon WA USA
Registered: Nov 2000


 - posted 03-31-2003 08:39 PM      Profile for Paul G. Thompson   Email Paul G. Thompson   Send New Private Message       Edit/Delete Post 
Michael, I do laugh about it now, but back in 1982 when it happened, it was not a laughing matter.

Jeeze, that shock hurt. It felt like every bone in me was busted for a while, too. It must have been one helluva reflex.

David, the Klystron was no big thing....it was the Magnetron, Thyratron, PFN (Pulse Forming Network), and the series resonant charging system used with the HVPS. That consisted in itself as the PFN, a Blocking Doide, and a Charging Choke. No bleeders in this one. One of our guys got hit with that thing, and that was posted on FT about the same time as when I described my date with the xenon igniter.

The HVPS developed 9,000 volts DC. The flywheel effect of the capacitance in the PFN and the inductance in the charging chole stacked up 18,000 volts on the PFN. That charge just sat there until a trigger came along and fired the thyratron, or when one of our guys accidently discharged it with his body.

Actually, 6 volts DC can knock you on your butt, too. I had an old 1950 Chevrolet and was working on the engine. I was going to "bump" the engine forward by using a wrench to energize the starter solenoid. A nice hot and humid Memphis Tennessee day....and I was sweaty as hell. When I used the wrench to bridge the contacts, the inductive kick of the solenoid knocked the wrench out of my hand and I was thrown backwards several feet.

 |  IP: Logged

Michael Schaffer
"Where is the
Boardwalk Hotel?"

Posts: 4143
From: Boston, MA
Registered: Apr 2002


 - posted 03-31-2003 10:24 PM      Profile for Michael Schaffer   Author's Homepage   Email Michael Schaffer   Send New Private Message       Edit/Delete Post 
Had you forgotten to cut the breakers in that lamphouse?

 |  IP: Logged

John Pytlak
Film God

Posts: 9987
From: Rochester, NY 14650-1922
Registered: Jan 2000


 - posted 04-01-2003 10:20 AM      Profile for John Pytlak   Author's Homepage   Email John Pytlak   Send New Private Message       Edit/Delete Post 
Some shocking links:

http://www.sotcher.com/techdocs/tech2.html

http://www2.agc-ca.org/services/SH&E/Safety/Sb97-2.htm

http://www.electrical-contractor.net/ESF/Controlling_Elec_Hazards_1.htm

 |  IP: Logged



All times are Central (GMT -6:00)
This topic comprises 2 pages: 1  2 
 
   Close Topic    Move Topic    Delete Topic    next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:



Powered by Infopop Corporation
UBB.classicTM 6.3.1.2

The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion and agrees to release the authors from any and all liability.

© 1999-2020 Film-Tech Cinema Systems, LLC. All rights reserved.