|
|
This topic comprises 3 pages: 1 2 3
|
|
Author
|
Topic: Which Projector Do You Start the Night On? (Changeover)
|
John Hawkinson
Film God

Posts: 2273
From: Cambridge, MA, USA
Registered: Feb 2002
|
posted 05-24-2003 12:18 PM
Comments about lamp life in the context of 2k changeovers surprise me, since I'm of the impression most people who do 2k changeovers leave the lamps on. We strike both lamps before the show (simultaneously), and wait until the end of the last show to shut them both off. I guess that if turning off our arcs didn't cause a sound system noise, we might turn one off earlier than the other...but it does.
We do have remote format control and light control on either side of both projectors (and volume control for non-sync but not film), so it's comfortable for us to start from either left or right. Generally generally we run our trailer reel on the left and reel 1 of the feature on the right. Primarily so that, for those rare occasions where our trailer reel is missing a trailer for one of the immediately upcoming films (e.g. next weekend), we stop the trailer reel right after the "Friday and Sunday" datestrip, and changeover to the slide projector, which is to the left of the left MP projector, and show a brief slide describing the upcoming feature.
Similarly, if we have 16mm elements (generally shorts), since our 16mm projector is to the right of the right MP projector, we might end up starting on the right to ease 35/16 changeovers, which are not automated in our booth.
--jhawk
| IP: Logged
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Gerard S. Cohen
Jedi Master Film Handler

Posts: 975
From: Forest Hills, NY, USA
Registered: Sep 2001
|
posted 05-24-2003 04:41 PM
I always started on the left machine, and loaded the reels in the bins from left to right. That's the way we read, in languages using the Latin alphabet, so it seems natural. (If you took a poll, would most Israeli projectionists start on the right, since Hebrew reads from right to left?)
Since the theatres where I worked changeovers had two or three shifts daily, it was an advantage to have all operators start the same way, as it avoided mistakes when the operators changed over between shifts. I think it was standard practice in NYC to start on the left for uniformity of operation, especially important when relief or emergency replacement projectionists would take over.
| IP: Logged
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
All times are Central (GMT -6:00)
|
This topic comprises 3 pages: 1 2 3
|
Powered by Infopop Corporation
UBB.classicTM
6.3.1.2
The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion
and agrees to release the authors from any and all liability.
|