|
|
This topic comprises 2 pages: 1 2
|
|
Author
|
Topic: The 5th Great Big 70mm Festival
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Stephen Furley
Film God

Posts: 3059
From: Coulsdon, Croydon, England
Registered: May 2002
|
posted 07-04-2005 07:05 AM
quote: Frank Angel Would you wind up having to thread-up on #5 or #4, even #3 on the sycn leader to compensate for the slow startup?
What does it matter where you have to lace up to get the changeover timing right? The only thing that matters is that the speed at which the machine runs up is consistant every time; how long it takes doesn't matter. Actually, I suppose In theory it would be a problem if the machine started *incrediby* slowly, so that you had to lace up just a few frames before the start of picture, but nothing's going to start up that slowly.
I think the latest point I've ever had to lace up, with Academy leader is a few frames after the '6'. This assumes of course that the cues are in the right place.
Has anybody else noticed that recently the motor cue tends to come early? It's not consistant, even between reels of the same print sometimes, but on many prints it's around 5-8 frames early. I'm talking about printed cues, not ones which somebody has scribed on by hand.
| IP: Logged
|
|
Frank Angel
Film God

Posts: 5305
From: Brooklyn NY USA
Registered: Dec 1999
|
posted 07-04-2005 08:00 AM
Yup. Done it many times, Brad. In one theatre we actually had a descrepance between the machines. One projector need to have [8]+4 frames in the gate and the other [9]+1 frame in the gate. Too many just pop in #8 and leave it at that. In fact after my first mentor taught me the method you detailed, another projectionist told me that was all crap, just put it on [3] so that if you miss, you will never have leader showing on the screen. When I told him I didn't think that was right, he said, "What do you think the black is for between number 3 and the picture? It's so if you are "late" all that happens is the screen goes black for a second. That's why it's there." He was a Union projectionist. Quite a number of his collegues did the same thing. This was in the local that covers Houston TX. Lucky for me, I had the a real craftsman as a teacher before I ever ran into these oafs.
quote: Stephen Furley What does it matter where you have to lace up to get the changeover timing right? The only thing that matters is that the speed at which the machine runs up is consistant every time; how long it takes doesn't matter.
Granted, Stephen, but there is concern that the sound drum might not stabilize with such a short roll-in. This was one of the issues that the SMPTE Projection Practices Committee debated back in the late 70s when they were working on standardizing the SMPTE Universal leader -- the TV people wanted it much shorter --after all, what did they need all that count-down time for? all they had to do is hit PLAY button and they are at speed in fractions of a second. Theatrical people on the other hand pleaded to leave the countdown at a substantial lengh that would allow the incoming projector sound drum to reach speed and stabilze.
| IP: Logged
|
|
|
|
All times are Central (GMT -6:00)
|
This topic comprises 2 pages: 1 2
|
Powered by Infopop Corporation
UBB.classicTM
6.3.1.2
The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion
and agrees to release the authors from any and all liability.
|