Film-Tech Cinema Systems
Film-Tech Forum ARCHIVE


  
my profile | my password | search | faq & rules | forum home
  next oldest topic   next newest topic
» Film-Tech Forum ARCHIVE   » Operations   » Film Handlers' Forum   » brittle prints break at startup - argh! (Page 2)

 
This topic comprises 3 pages: 1  2  3 
 
Author Topic: brittle prints break at startup - argh!
Robert Minichino
Master Film Handler

Posts: 350
From: Haskell, NJ, USA
Registered: Dec 2005


 - posted 11-25-2008 08:32 AM      Profile for Robert Minichino   Author's Homepage   Email Robert Minichino   Send New Private Message       Edit/Delete Post 
Mark,

Hitachi has an encoder feedback module for their SJ300 VFD. That should give better speed regulation than a sync motor without feedback and be significantly cheaper than a DC servo system.

 |  IP: Logged

Frank Angel
Film God

Posts: 5305
From: Brooklyn NY USA
Registered: Dec 1999


 - posted 11-25-2008 11:17 AM      Profile for Frank Angel   Author's Homepage   Email Frank Angel   Send New Private Message       Edit/Delete Post 
How do you do changeovers with a long ramp-up speed?

 |  IP: Logged

Robert Minichino
Master Film Handler

Posts: 350
From: Haskell, NJ, USA
Registered: Dec 2005


 - posted 11-25-2008 12:30 PM      Profile for Robert Minichino   Author's Homepage   Email Robert Minichino   Send New Private Message       Edit/Delete Post 
You just thread up later (lower number) on the leader on the incoming projector. The longer ramp times also tend to be more predictable, so you can make your changeovers more repeatable.

 |  IP: Logged

Tony Bandiera Jr
Film God

Posts: 3067
From: Moreland Idaho
Registered: Apr 2004


 - posted 11-25-2008 02:40 PM      Profile for Tony Bandiera Jr   Email Tony Bandiera Jr   Send New Private Message       Edit/Delete Post 
Robert's right...the ramp times are very predictable and make for easy changeovers. I have a relatively short ramp time on my machines at UC Irvine, and I thread up 12 frames past "8" on the Academy leader..my changeovers will hit the first or second frame of the incoming reel.

quote: Phil Hill
Using an inverter will allow the 120vac single-phase supply power to be converted to 208/230 volt 3-phase for the motor.

Yep, the coot's absolutely correct. Many brands of inverters will accept 120vac single phase and give you the three phase out.

I have used ABB and Woods E-Trac inverters with no speed regulation issues. I have also used Danfoss, a quality inverter but very touchy on setup (I call 'em Damn-Fussy).

Another thing to remember when dealing with inverters, regardless of brand: READ the manual throughly!! And be sure to set the "PWM Frequency" (the basic frequency of the output, most are set at 4,000 or 8,000 from the factory) to the setting that produces the least amount of whine and noise.

 |  IP: Logged

Frank Angel
Film God

Posts: 5305
From: Brooklyn NY USA
Registered: Dec 1999


 - posted 11-25-2008 07:09 PM      Profile for Frank Angel   Author's Homepage   Email Frank Angel   Send New Private Message       Edit/Delete Post 
quote: Robert Minichino
You just thread up later (lower number) on the leader on the incoming projector.
You mean later -- on a higher number, no?

 |  IP: Logged

Tim Reed
Better Projection Pays

Posts: 5246
From: Northampton, PA
Registered: Sep 1999


 - posted 11-25-2008 07:49 PM      Profile for Tim Reed   Author's Homepage     Send New Private Message       Edit/Delete Post 
Lower number, Frank. The projector is taking longer to come up to speed.

 |  IP: Logged

Steve Guttag
We forgot the crackers Gromit!!!

Posts: 12814
From: Annapolis, MD
Registered: Dec 1999


 - posted 11-25-2008 09:33 PM      Profile for Steve Guttag   Email Steve Guttag   Send New Private Message       Edit/Delete Post 
I tend to target 2.75-3.00 second ramp ups. Most operators are comfortable with them and you don't have flutter issues with the sound on changeover.

I've been happy with both TB Woods and Lenze inverters. I've also had very good luck and perfect speed (checked with strobe) on Bodine Inverter rated motors.

I've used other brands of inverters and other motors and have had less than accurate results...normally being the inverter's fault...it said 60Hz but as it turns out (verified on an O'scope) it wasn't.

For most industrial applications...the speed variance isn't significant...for film, in my opinion, there is the correct speed and the rest is incorrect. It affects not only motion but the pitch of the sound (and over 2-hours, the actual running time).

 |  IP: Logged

Brad Miller
Administrator

Posts: 17775
From: Plano, TX (36.2 miles NW of Rockwall)
Registered: May 99


 - posted 11-26-2008 04:22 AM      Profile for Brad Miller   Author's Homepage   Email Brad Miller       Edit/Delete Post 
I'll have to look at the ramp-up time on my inverters in my screening room, as I specifically did a number of tests to find out just how slow I could have it start without sacrificing a drop from SRD to analog at the changeovers. I do not recall what that number was off the top of my head though.

 |  IP: Logged

Steve Guttag
We forgot the crackers Gromit!!!

Posts: 12814
From: Annapolis, MD
Registered: Dec 1999


 - posted 11-26-2008 07:06 AM      Profile for Steve Guttag   Email Steve Guttag   Send New Private Message       Edit/Delete Post 
Brad, I seem to recall you telling me that 5-seconds was the ramp up time that just barely made it, sound wise.

Steve

 |  IP: Logged

Gordon McLeod
Film God

Posts: 9532
From: Toronto Ontario Canada
Registered: Jun 99


 - posted 11-26-2008 09:18 AM      Profile for Gordon McLeod   Email Gordon McLeod   Send New Private Message       Edit/Delete Post 
I set up our Baldor and Gavazzi invertors on the vic8's and vic 5's as a 4 sec up ramp and 2 sec down ramp

 |  IP: Logged

Steve Guttag
We forgot the crackers Gromit!!!

Posts: 12814
From: Annapolis, MD
Registered: Dec 1999


 - posted 11-26-2008 11:05 AM      Profile for Steve Guttag   Email Steve Guttag   Send New Private Message       Edit/Delete Post 
On ramp downs (and I normally ramp down, not coast)...I tend towards 5 seconds or so from 24fps.

 |  IP: Logged

Scott Norwood
Film God

Posts: 8146
From: Boston, MA. USA (1774.21 miles northeast of Dallas)
Registered: Jun 99


 - posted 09-30-2009 09:29 PM      Profile for Scott Norwood   Author's Homepage   Email Scott Norwood   Send New Private Message       Edit/Delete Post 
Bump.

As an update, I finally got around to installing the flywheels (which involved rerouting the takeup belts) and they made a world of difference in smoothing out the startup of the machines. Everything is now as gentle as can be, with no "bounce" in the takeup at all.

The slow-start kits are next weekend's project, but I am now questioning whether they are necessary at this point.

Three-phase motors with inverters would have been nice, but also would have been cost-prohibitive, especially since I don't absolutely need variable-speed operation.

 |  IP: Logged

Frank Angel
Film God

Posts: 5305
From: Brooklyn NY USA
Registered: Dec 1999


 - posted 10-02-2009 03:28 AM      Profile for Frank Angel   Author's Homepage   Email Frank Angel   Send New Private Message       Edit/Delete Post 
I taken it you were having snapping problems with you older acetate prints, yes? Perhaps adding a length of poly leader right at the start of the count down so that the initial tug will be on poly and not the acetate would be the poor man's solution, although it sounds like the flywheel addition pretty much solved your problem fairly well.

Nice to hear that you had a successful outcome without too much headache....love when that happens!

 |  IP: Logged

Robert Throop
Master Film Handler

Posts: 412
From: Vernon, NY USA
Registered: Jun 99


 - posted 10-02-2009 01:00 PM      Profile for Robert Throop   Email Robert Throop   Send New Private Message       Edit/Delete Post 
quote: Monte L Fullmer
We know that the Mirrorphonic 7400 soundheads were chain driven
.
Monte,
I think you mean the Motiograph SH 7500 soundheads. The Erpi TA7400 was an entirely different beast. These were also called Mirrophonic.
Bob

 |  IP: Logged

Bruce Hansen
Jedi Master Film Handler

Posts: 847
From: Stone Mountain, GA, USA
Registered: Dec 1999


 - posted 10-02-2009 07:27 PM      Profile for Bruce Hansen   Email Bruce Hansen   Send New Private Message       Edit/Delete Post 
Would using a plastic reel for take-up help it keep up, since it would be lighter? Could you put a spring on one of the rollers?

 |  IP: Logged



All times are Central (GMT -6:00)
This topic comprises 3 pages: 1  2  3 
 
   Close Topic    Move Topic    Delete Topic    next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:



Powered by Infopop Corporation
UBB.classicTM 6.3.1.2

The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion and agrees to release the authors from any and all liability.

© 1999-2020 Film-Tech Cinema Systems, LLC. All rights reserved.