Film-Tech Cinema Systems
Film-Tech Forum ARCHIVE


  
my profile | my password | search | faq & rules | forum home
  next oldest topic   next newest topic
» Film-Tech Forum ARCHIVE   » Operations   » Ground Level   » Regal CineMedia News (Page 6)

 
This topic comprises 6 pages: 1  2  3  4  5  6 
 
Author Topic: Regal CineMedia News
Paul Linfesty
Phenomenal Film Handler

Posts: 1383
From: Bakersfield, CA, USA
Registered: Nov 1999


 - posted 06-17-2003 05:38 PM      Profile for Paul Linfesty   Email Paul Linfesty   Send New Private Message       Edit/Delete Post 
Well, if Mike had said "check the frame/focusing" I would have been less concerned [Smile]

 |  IP: Logged

Scott Norwood
Film God

Posts: 8146
From: Boston, MA. USA (1774.21 miles northeast of Dallas)
Registered: Jun 99


 - posted 06-17-2003 05:53 PM      Profile for Scott Norwood   Author's Homepage   Email Scott Norwood   Send New Private Message       Edit/Delete Post 
What happens if there are fewer than twenty (2wenty?) minutes between showtimes? Does the DLP show start late or does it start several minutes into it?

And, yes, I agree with the others: thread in frame! And, in most cases, there shouldn't be a need to adjust focus except when prints move or when there is a lens change (double feature, print move, etc.).

 |  IP: Logged

Paul Linfesty
Phenomenal Film Handler

Posts: 1383
From: Bakersfield, CA, USA
Registered: Nov 1999


 - posted 06-17-2003 06:23 PM      Profile for Paul Linfesty   Email Paul Linfesty   Send New Private Message       Edit/Delete Post 
Although, as a moviegoer, I have to be honest and say I prefer the frame to be adjusted at the start (as one megaplex nearby ALWAYS does) than to have the film hit out of frame and STAY out of frame (which is what happens at another megaplex nearby). Too bad the thread-in-frame seems to be a dying practice around here (in Bakersfield, not in F-T) [Roll Eyes]

 |  IP: Logged

Mike Olpin
Chop Chop!

Posts: 1852
From: Dallas, TX
Registered: Jan 2002


 - posted 06-17-2003 07:49 PM      Profile for Mike Olpin   Email Mike Olpin   Send New Private Message       Edit/Delete Post 
AGHHHH!!! THE FLAMES! THEY BURN!

Of course I thread in frame. Like Carl says, its importaint to check these things. Please note that i added only 5 seconds per start to check all this. All in all you save 15 seconds on the whole run. Theatre 8 still starts 1:45 late.

 -

Now to answer the questions:

In the time between the end of the last show, and the begining of the 2wenty, nothing is on the screen, and there is no sound.

There never is a turnaround that is under 20 minutes. But since you asked, there is a device that is attatched to the wall outlet the slide projector used to plug into. When power flows into this device, it allows the L6 projector to show the preshow. If power is interupted (as is the case whenever the 35mm is running) it puts the L6 into standby mode, and won't let it exit standby mode until power is restored (the 35mm shuts off).

 |  IP: Logged

Thomas Procyk
Phenomenal Film Handler

Posts: 1842
From: Royal Palm Beach, FL, USA
Registered: Feb 2002


 - posted 06-18-2003 06:38 PM      Profile for Thomas Procyk   Email Thomas Procyk   Send New Private Message       Edit/Delete Post 
Threading in frame is a no-brainer, but like Mike showed, sometimes there's a need to make a little "adjustment" now and then. Some trailers, (and in some cases, features as discussed in another thread) have these little framing nuances that need to be corrected now and again. This is why the idea of "locking down" the framing knob is retarded. (There, I said it.)

Our print of "Nemo" starts out with the "Brother Bear" trailer which has the green band text printed low on the screen. If the operator doesn't stand there to check and make SURE the framing is right and it's just the trailer, he'll rack it up to center and then there will be a black line at the bottom when the hard-matte feature starts.

=TMP=

 |  IP: Logged

Brad Miller
Administrator

Posts: 17775
From: Plano, TX (36.2 miles NW of Rockwall)
Registered: May 99


 - posted 06-19-2003 04:11 AM      Profile for Brad Miller   Author's Homepage   Email Brad Miller       Edit/Delete Post 
quote:
Our print of "Nemo" starts out with the "Brother Bear" trailer which has the green band text printed low on the screen. If the operator doesn't stand there to check and make SURE the framing is right and it's just the trailer, he'll rack it up to center and then there will be a black line at the bottom when the hard-matte feature starts.
And THAT is precisely why locking down the framing knobs is the best possible thing for a mainstream theater. Trailers are getting real bad about not being center framed. So when projectionists tweak the framing on them, they are actually screwing up the feature's framing.

What's more important, a trailer running perfectly in frame or the feature? Think about it. A locked down framer absolutely guarantees the feature (the part of the show that the customers patronized your theater to see) will be presented properly. Either it's dead on perfect, or it's way off.

So Thomas, when you work a shift after someone else, do you have to run around and check all of the framer settings? Of course you do! Because you have no idea what the last guy did. If your framers were locked down, you wouldn't have to worry about it. So long as you threaded in frame, it would be dead centered every show. I have better things to do than play jack-around for an entire round of shows after a projectionist who either used the framer as a crutch or from adjusting to a trailer that was not printed centered. The last mainstream feature I have seen that was printed off center was 1992, and that's a good enough record for me to lock those damn things down.

You crazy guys and your framing controls! (There, I said it. [Razz] )

 |  IP: Logged

Josh Kirkhart
Expert Film Handler

Posts: 165
From: Austin/Houston, TX, USA
Registered: Nov 2001


 - posted 06-19-2003 04:58 AM      Profile for Josh Kirkhart   Email Josh Kirkhart   Send New Private Message       Edit/Delete Post 
http://www.comingsoon.net/news.php?id=317

Little article about how powerfull this in-theatre Digital Promotion may get.

 |  IP: Logged

Thomas Procyk
Phenomenal Film Handler

Posts: 1842
From: Royal Palm Beach, FL, USA
Registered: Feb 2002


 - posted 06-23-2003 01:33 PM      Profile for Thomas Procyk   Email Thomas Procyk   Send New Private Message       Edit/Delete Post 
Brad -- Why not have the trailers AND feature in frame? [Smile] Unfortunately, yeah, the framing knobs are all screwed up when I come in. Usually racked to their extremities. The other "operators" blame the equipment. [Roll Eyes]

But my point was, regardless of whether you thread in perfect frame every time, there WILL be instances where you need to adjust framing. Shrunken prints, lab printing errors from reel to reel, etc. Sure, in a perfect situation you wouldn't need to, but everyone knows only digital projection can be perfect. [Wink]

Besides, what if you have a brand new, perfect answer print threaded in frame all running well and a stray moth, or some other fluttering insect makes its way into the booth and is mesmorized by the bright Xenon only to fly into the intermittent and cause it to jump a sprocket. OOps! Have to re-thread because the framing knob is locked down! [Razz]

BLAH! I thought this thread was about Regal CineMedia!!

=TMP=

 |  IP: Logged

Brad Miller
Administrator

Posts: 17775
From: Plano, TX (36.2 miles NW of Rockwall)
Registered: May 99


 - posted 06-23-2003 03:07 PM      Profile for Brad Miller   Author's Homepage   Email Brad Miller       Edit/Delete Post 
Is the bug problem in Florida really that bad? Still, with mainstream films I haven't found a need to adjust framing for 10 years. Now if we're talking about independent arthouse product...well that's a different story. Those prints are a joke.

 |  IP: Logged

John Pytlak
Film God

Posts: 9987
From: Rochester, NY 14650-1922
Registered: Jan 2000


 - posted 06-23-2003 03:28 PM      Profile for John Pytlak   Author's Homepage   Email John Pytlak   Send New Private Message       Edit/Delete Post 
With normal contact printing, the only vertical shift that the lab should be able to introduce is the difference between the perf height of the BH-1866 negative perf (0.073 inches) and the KS-1870 perf height (0.078 inches), at most 0.005 inches, depending on the direction the film was transported during printing. This relatively small shift is sometimes seen reel-to-reel on prints made on a bi-directional printer.

When the image shifts more than this, the fault likely is in the original cinematography (composition), or may be due to improper setup of the optical printer or digital recorder being used for titles or effects.

Standard SMPTE 195 specifies the tolerances for vertical position with dimensions J=K nominally equal (the horizontal centerline should be equidistant between two perforations) and dimensions F=H within 0.012 inches (0.30mm) for the top and bottom of the projectable image area.

 |  IP: Logged

John Hawkinson
Film God

Posts: 2273
From: Cambridge, MA, USA
Registered: Feb 2002


 - posted 06-26-2003 02:03 AM      Profile for John Hawkinson   Email John Hawkinson   Send New Private Message       Edit/Delete Post 
5 thousandths of an inch is one quarter of one degree on a framing knob with 4 perfs worth of travel. [Razz]

--jhawk

[Edit: math was right, but we care about 4 perfs, not 4 frames. ]

[ 06-26-2003, 12:27 PM: Message edited by: John Hawkinson ]

 |  IP: Logged

Charles Everett
Phenomenal Film Handler

Posts: 1470
From: New Jersey
Registered: May 2001


 - posted 10-17-2003 07:15 PM      Profile for Charles Everett   Email Charles Everett   Send New Private Message       Edit/Delete Post 
Now, when The 20wenty ends, there are little "movie camera" logos in the top left and top right corner of the screen. This nice little visual cue alerts the booth to start the film projector for the trailers and feature.

I noticed these "movie camera" logos on the end of The 20wenty when I saw Casa de los Babys at the UA Union Square.

 |  IP: Logged

Jesse Skeen
Phenomenal Film Handler

Posts: 1517
From: Sacramento, CA
Registered: Aug 2000


 - posted 10-17-2003 08:09 PM      Profile for Jesse Skeen   Email Jesse Skeen   Send New Private Message       Edit/Delete Post 
Why not just put in the standard changeover cues at the end of it? [evil]

 |  IP: Logged

Mike Olpin
Chop Chop!

Posts: 1852
From: Dallas, TX
Registered: Jan 2002


 - posted 10-17-2003 08:14 PM      Profile for Mike Olpin   Email Mike Olpin   Send New Private Message       Edit/Delete Post 
They just added these about a month ago because some projectionists were jumping the gun and starting the film projector before the regal logo had finished flying out onto the screen.

Edit - last Friday the policy trailer was revised again, and a significant portion has been cut. It is now under 35 seconds, down from the 2 minute original described earlier in this thread.

[ 10-20-2003, 09:26 PM: Message edited by: Mike Olpin ]

 |  IP: Logged



All times are Central (GMT -6:00)
This topic comprises 6 pages: 1  2  3  4  5  6 
 
   Close Topic    Move Topic    Delete Topic    next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:



Powered by Infopop Corporation
UBB.classicTM 6.3.1.2

The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion and agrees to release the authors from any and all liability.

© 1999-2020 Film-Tech Cinema Systems, LLC. All rights reserved.