|
|
This topic comprises 4 pages: 1 2 3 4
|
|
Author
|
Topic: Two Towers and INTERMISSION!
|
|
|
|
|
|
|
|
|
|
|
Pete Naples
Phenomenal Film Handler

Posts: 1565
From: Dunfermline, Scotland
Registered: Feb 2001
|
posted 12-18-2002 05:43 PM
The Westrex 5035 manual describes soft start arrangements for various projectors common at the time. Westrex 2001 with 2002/2003 rep set. Done more or less as Ken desribed using a multi tapped auto transformer and bloody big resistor. If you spend a bit of time setting the tap and resistance right you can achieve a reliable run about of about 6 seconds or so, which will quite happily start with the tower even on small non-floating hub spools. There is a similar arrangement described in the book for using the tower with Cinemecannica and Kalee machines. That time delay thing on the Westrex 7000 was really meant to work with it's on board take up motor, you press START, the take up runs and the loop damper tensions up, about 7 seconds after you press START the projector motor comes in, and yup it does start up pretty fast. However there is yet another multi tapped transformer in there (seems a common Westrex theme this!), which if adjusted just right you could achieve a safe run up for use with the tower.
Ken you are so right about the venerable old 5035. Those things just go and go and go. Even when very ill it is almost unheard of to loase a show, there's always the other side, running film on the rewind tension, rewinding on the run tension etc, etc.
| IP: Logged
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Ken McFall
Jedi Master Film Handler

Posts: 615
From: Haringey, London.
Registered: Apr 2001
|
posted 12-19-2002 06:54 PM
OK Here's some pics of my interlock setup.
All Vic 8's with TA10 automation. All mounting brackets for Film Wrap sensors and DTS heads have been made in house. Full install done by yours truly.
System is very simple and totally reliable..... too late I've said it now
Here's the first prijector in the interlock, Screen 1 our THX screen. The film follows the normal film path to the projector but is sent down the line by the red roller mounted on the side of the column. The film cleaner is hung onto the column and is applying Film Guard... The film is LORT Two Towers runing from bottom plate, not shown.

Front view of platter one showing film feed into projector and supply to second projector. The film runs at high level on a cable tray.....

Loop absorber between projectors 1 & 2... home made! It has about 8 feet of absorbtion which is not really needed. It never moves more that a couple of inches either way, which is just the slack in the system between the two projectors. Projectors are of course running on inverters. The TA10 takes care of communication between each projector.

Film arriving at second projector from high level. It enters the platter and follows normal lacing path thru wrap sensor, projector and onto take-up plate.

Long shot of box from projector 1 towards 2, 3 & 4.... showing make-up station between projectors 1 & 2. Note we have a spare non-rewind for making up and breaking down prints.... very useful!

Long shot from projector 2 showing film storage units... made to my spec for easy movement. Films stand on the carriers at an angle one on each side. You can also see, top left, the red high level rollers used for interlocking screen 2 & 3. The wiring tray was a very usful part of the existing installation.

Another view of first projector in interlock showing feed and supply to second projector and film cleaner. The cleaner simply hangs onto the column so can be easily moved around. The film wrap sensors will 'ALWAYS' stop the projector without any damage to the print. The film wrap sensors are made by Nigel Shaw with my mods and the control box is my design.

The TA10 makes the whole system very easy to use. You need to tie back the take-up arm on the supply projector, as you can see above, or that projector will not run. Apart from that it's simply a long lacing leader and a start cue. A push of the start button and everything runs as normal. We have 1 1/2 minutes between each show so no problems with running about. See first show on and then walk slowly down to the next. We can currently run three screens in interlock, adding the fourth screen would be a simple matter.
I have to admit I enjoy the freedom I have that allows me to design, manufacture and install system such as this. The fact that I actually show films myself means they are installed with ease of use very much in mind. Some engineers unfortunatly install equipment technically correct but with no idea or thought given to ease of use.
Hope this is of interest to you all.
Happy to get any comments....
Regards.
| IP: Logged
|
|
Kelsey Black
Film Handler

Posts: 58
From: Pima, Arizona, USA
Registered: Aug 1999
|
posted 12-19-2002 11:14 PM
Back on the subject of intermissions on towers, I've had my print since Tuesday morning and ever since I've built it up I've thought of coming on here and seeing the general consensus on where to place an intermission. I think I decided on the best place for an intermission quite by chance, and it's not between reels 4 & 5.
try between 6 & 7. that way people have a bit over 2 hours to empty their drinks and popcorns, fill their bladders and get uncomfortable in their seats, then go to the concession stand and load up again for the best hour in the film. And, I have reels 7,8,9 on a 6000' reel, which makes the intermission a breeze to run on my double-sided tower that only has one functional side.
And on a side note, I run my intermissions with as much lead out soundtrack as I can before the beep, then place an intermission snipe, and then one trailer in which the side lights come up during, then the auditorium lights come up. I start the second part by dimming the auditorium lights over 10 seconds, 10 seconds before the green band of another trailer (long as possible) for people in the lobby to hear, get back to their seats, get their eyes readjusted to the darkness, then the side wall lights go down when the credits on the trailer start... insert 10 seconds of black silence for people to digest the trailer, remember where they were in the movie, and dialate their pupils further, then sound lead-in and picture on screen.
If I had enough 36" reels in good enough shape to run I'd try the intermission between reels 4 & 5, but then I had to bring in my own 6k reel from home to even do this.
gotta go, our 7:00 show just got out.
Kelsey Black www.WillcoxMovies.com
| IP: Logged
|
|
|
|
All times are Central (GMT -6:00)
|
This topic comprises 4 pages: 1 2 3 4
|
Powered by Infopop Corporation
UBB.classicTM
6.3.1.2
The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion
and agrees to release the authors from any and all liability.
|