John Walsh
Film God

Posts: 2490
From: Connecticut, USA, Earth, Milky Way
Registered: Oct 1999


 - posted 09-30-2005 07:46 AM      Profile for John Walsh   Email John Walsh   Send New Private Message       Edit/Delete Post 
Dave- I see your reasoning about simply raising the floor, but -sometimes- there are reasons why it would cost more. For example, if the projection room (PR) floor is raised, the PR ceiling has to go up -which means the roof has to go up. Sometimes, there's not much room between the PR suspended ceiling and the roof to clear AC ducts. At one job I worked on, the architect told me raising the roof costs $7500 per foot (of course that varies per size.) How high up stadium seating runs affects where the PR floor is. Zoning may not allow a building to be higher than some set height.

Although, I've never seen where all projectors were raised in a PR; just where the large auditouriums were. If you have a place like that, and there's plenty of room above the PR suspended ceiling, then I'd agree that an architect was lazy or screwed up there. Or maybe they had to work around some stupid zoning law.

 |  IP: Logged

Steve Scott
Phenomenal Film Handler

Posts: 1300
From: Minneapolis, MN
Registered: Sep 2000


 - posted 09-30-2005 01:23 PM      Profile for Steve Scott   Email Steve Scott   Send New Private Message       Edit/Delete Post 
I started off in the long hallway booths. At Muller's Lakeville, we had 18 machines stretched over roughly 430 feet. You could see completely down the hallway from either end, and thanks to the wash from the consoles it was quite easy to see what equipment was running. We were, really, the only location with such visual versatility; the other Muller hallway booths had protruding auditorium walls or tightly packed equipment which prevented a clear view. Concurrently, Lakeville was the only building without status panels.

It's a lot more isolated at St. Anthony, where the projectors are mostly on straight angles in booths behind each auditorium.

 |  IP: Logged

Louis Bornwasser
Film God

Posts: 4441
From: prospect ky usa
Registered: Mar 2005


 - posted 10-01-2005 08:29 AM      Profile for Louis Bornwasser   Author's Homepage   Email Louis Bornwasser   Send New Private Message       Edit/Delete Post 
Dave: the "tight" relationship you describe is caused when architects copy each other's work. This error crept into stadium theatre designs; the projector is on the same elevation as the back row of seats.

Sometimes these concrete pads are poured in the booth with no regard to how much they weigh. I wonder often if the underlying floor is rated for the tonnage of all that 'crete. (Hopefully it is a hollow pour.) Louis

 |  IP: Logged

Robert E. Allen
Phenomenal Film Handler

Posts: 1078
From: Checotah, Oklahoma
Registered: Jul 2002


 - posted 10-01-2005 10:29 AM      Profile for Robert E. Allen   Email Robert E. Allen   Send New Private Message       Edit/Delete Post 
The ten screen Regal cinema (built in '99) where I worked was built that way. Six machines on one side and four on the other. It is as long as a football field. Every so often our GM (a really nice guy) would draw up a schedule without thinking about the manager/projectionists and scheduled machine one and machine seven (on opposite ends of the booth) to start at the same time. I decided that, since I would have a lot of trouble with a 40 yard dash, I was not going to do a 100 yard dash and got to the second machine as soon as a brisk walk would get me there.

 |  IP: Logged

Jack Ondracek
Film God

Posts: 2348
From: Port Orchard, WA, USA
Registered: Oct 2002


 - posted 10-01-2005 11:18 AM      Profile for Jack Ondracek   Author's Homepage   Email Jack Ondracek   Send New Private Message       Edit/Delete Post 
quote:
scheduled machine one and machine seven (on opposite ends of the booth) to start at the same time. I... got to the second machine as soon as a brisk walk would get me there.

... which probably made you real popular when the start times got tattled to their noc, and the dm wanted to know why your shows weren't starting on time, eh?

 |  IP: Logged

Richard Fowler
Film God

Posts: 2392
From: Ft. Lauderdale, FL, USA
Registered: Jun 2001


 - posted 10-01-2005 12:26 PM      Profile for Richard Fowler   Email Richard Fowler   Send New Private Message       Edit/Delete Post 
Elevating a projection platform would usually happen on past projects in the largest rooms usually in an existing shell of a shopping center with roof restrictions. The overall deck for the booth was framed and attached per limitations of the building. In a couple of locations we had steel decking welded at each "problem" location which was much lighter than a concrete pour to stay within floor loading situations.
The first large multiplex I did ( eight screens in 1978 ) was a 210 foot long ( 64 meter )room with one operator who used roller skates [Smile]

 |  IP: Logged

Andy Summers
Master Film Handler

Posts: 397
From: Bournemouth Dorset United kingdom
Registered: Jun 2005


 - posted 10-01-2005 03:55 PM      Profile for Andy Summers         Edit/Delete Post 
Burce’

I like that a pool table, or chess even and while your deciding on making your move with the other projectionist the audience shout up to the booth come on roll the film. LOL
[Smile]

 |  IP: Logged

Robert E. Allen
Phenomenal Film Handler

Posts: 1078
From: Checotah, Oklahoma
Registered: Jul 2002


 - posted 10-02-2005 01:32 AM      Profile for Robert E. Allen   Email Robert E. Allen   Send New Private Message       Edit/Delete Post 
quote: Jack Ondracek
... which probably made you real popular when the start times got tattled to their noc, and the dm wanted to know why your shows weren't starting on time, eh?
Actually Jack there were only a couple of complaints while I was there and they were about films being started too early (and that happened when the "Twenty" failed to play.

I was actually able to make it from one end of the booth to the other within the 45 seconds allowed by Regal.

 |  IP: Logged

Jarryd Beard
Expert Film Handler

Posts: 229
From: Hellertown, PA
Registered: Jul 2004


 - posted 10-02-2005 05:10 PM      Profile for Jarryd Beard   Email Jarryd Beard   Send New Private Message       Edit/Delete Post 
quote: Aaron Mehocic
Perhaps if Jarryd Beard is lurking out there he can catch us up to speed on things.
The Maxi Saver 12 is still around. I was only there once, however. Watching Matrix 3, the print was spiked. Talking to the manager (really nice guy, forget his name), I was told the print wasn't first run from either of the Carmikes in the area(Carmike 10 or Galleria 6), but rather from Cinemagic Squirrel Hill. No presentation problems from the theatre itself were noted. I believe the Waterworks is still around. There are ads in the Post-Gazette.

PS: Upon receiving "Four Brothers" second run from Cinemagic Squirrel Hill a month or so back, I've lost all respect. The print was badly scratched, "spliced" with masking tape after each reel filled (disregarding the original opaque splice used during makeup), leaving an entire empty reel in the can. One of the splices jammed in the gate upon our projectionist's screening. Lucky, the theatre I'm now working at was in such a state of neglect at the time, the over three year old 1600W bulb never melted the film. I'm glad to say, since my manager and I have been there, all bulbs were replaced/rotated as needed, a new spare in reserve.
[fu] [fu] [fu] Cinemagic [puke]

 |  IP: Logged



All times are Central (GMT -6:00)
This topic comprises 2 pages: 1  2 
 
   Close Topic    Move Topic    Delete Topic    next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:



Powered by Infopop Corporation
UBB.classicTM 6.3.1.2

The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion and agrees to release the authors from any and all liability.

© 1999-2020 Film-Tech Cinema Systems, LLC. All rights reserved.