This is topic Projectionistless Projector in forum Film Handlers' Forum at Film-Tech Forum ARCHIVE.


To visit this topic, use this URL:
https://ft-forum.com/ft/cgi-bin/ubb/ultimatebb.cgi?ubb=get_topic;f=1;t=003037

Posted by Joe Redifer (Member # 3) on 02-01-2002, 01:34 AM:
 
Ad from a trade magazine?


 


Posted by William Hardie (Member # 1112) on 02-01-2002, 02:37 AM:
 
Please see later post in this thread


 


Posted by Gerard S. Cohen (Member # 994) on 02-01-2002, 12:16 PM:
 
Here's a reaction from a retired projectionist in Pennsylvania:

Dear Mr Cohen
I certainly hope the poster was a gag. To tell you the
truth in the industry as it stands now I don't know
if such a thing IS a gag anymore. I can tell you this.
If there was such a contraption they wanted to sell
it on the merits of the fact that it had an
"automatic framer" they wouldn't sell a single one.
Running a whole show with the film out of frame or
out of focus with their current equipment does not
bother a lot of exhibitors now.
More later
Paul

 


Posted by Dave Williams (Member # 299) on 02-01-2002, 01:58 PM:
 
Actually, while this so called ad may be a gag, it is possible to automate threading and framing. You don't even have to thread it up once as this ad would state. It wouldn't take much to design it, and a laser guided framing system would look for the frame lines and always keep it in frame, even if you had a bad splice. The framing time would be within a few frames so no one would ever notice.

With todays projectionist having so little training as most owners dont truly care about it, it is a good idea. Hell you can use an imaging system to keep it in focus as well. All it would have to do is scan each fram as it goes through and match what is projected on screen. Todays technology is rather amazing.

Who cares anyway, it's all DVD in five years anyhow.

Dave
 


Posted by Mark Gulbrandsen (Member # 72) on 02-02-2002, 01:14 PM:
 
Gerard, Most "retired projectionists" don't have a clue as to what going on today, at least if they ave been retired for any length of time.
Is is certainly possible to automate all of this. No problem.
Mark @ GTS
 
Posted by Will Kutler (Member # 770) on 02-02-2002, 01:42 PM:
 
Mark!

I actually had an old time IATSE projectionist who is still working ask me if Simplex was still in business...he thought they were defunct!
 


Posted by Ethan Harper (Member # 472) on 02-02-2002, 02:13 PM:
 
I was always hoping that robots would eventually take over my job or a really really smart monkey named George.

------------------
--"That's my story and i'm sticking to it!"--
 


Posted by Steve Kraus (Member # 476) on 02-03-2002, 01:25 AM:
 
Dave Williams wrote:
>The framing time would be within a few frames so no one would
>ever notice.

Actually with an electronic drive projector it can be done instantaneously (assuming you've figured out that it's out of frame). You simply command the stepper to advance 2, 3, 5, or whatever number of perfs instead of 4 as part of its normal pulldown.
 


Posted by William Hardie (Member # 1112) on 02-03-2002, 03:43 AM:
 
I have been asked to remove my post, and after it was explained to me why it made sense.

Anyhow it is late. I just worked a second 13.5 hour day, and I am tired.

I have a question about my Vic VIII's and an oil return problem which I will post then it is off to sleep.

Cheers,

Bill


 






Powered by Infopop Corporation
UBB.classicTM 6.3.1.2