And I won't say much about the content except two words -- pretentious and boring....I lied, make it three -- gobble -- it's THAT much of a turkey.
So, anyone have any idea why they would break these reels like that? I understand in musicals they used to try to make reel breaks where there was no musical number (although this was not always an attainable goal). But at these two reel break locations, you could have racked down to 3 and you wouldn't have missed anything. Better still, you could have skipped reels and no one would have noticed. We started off with about 250 and when the house light came up, there were about 50 left in the theatre -- Uma Thurman's fans, no doubt.
Mr.Hawke needs to take a course in cinema 101 before attempting his first film....and while he is at it, drag his his cinematographer and lighting designer might as well, making them take their first course in their respective fields.
Frank
PS...that goes double for the film cutter.
Why is it that some actors think they can Direct a movie.
quote:
You got 1000 foot reels from the editor because that's the size of the platters on an editing table.
Ah, but that just pushes the cause back a step. Why does the flat bed have 1000 foot plates?
This of course does not come into play when a film ships on 1000' reels. It seems that many labs/distributors/archives in Europe and Asia still use this method of shipping and storing features, but I am not exactly sure why that might be. Perhaps Mr. Enticknap can offer some input as an archivist.
The last operator to handle a print before I get it.
More and more as second run operator I see the prior operator just filling a reel and cutting it off anywhere. Despite the larger number of wide releases the quality of most prints I get continues to steadily decline. What else can you expect with multiplex mania and its accompanying fiscal irresponsibility where most chains employ floor staff for the booth?
- - - - - - - - - - - - - - - - - -
Where you stand on issue depends upon where you sit!
1000' reels made rapid access to specific shots/scenes possible.
We referred to them as 1A, 1B, 2A, 2B so that we could keep it clear as to which was the head of a reel and which was the tail, and we used a template so that we always knew just where the cue dots would go. Dark shots and fade outs were a major no-no.
We even kept a footage count so that the cans would be balanced!
The film editor was Mr. Andrew Mondshein. Maybe we should create an award (!?)
------------------
And, hey! Let's be careful out there.
~Manny.
Now with most films being editing on workstations I presume that workprints are probably being conformed to the EDL directly as 2000' rolls rather than 1000' lengths and then doubled up for test screenings. (And when a test screening is at a theatre those will get built up on platter & MUT anyway.)
The 1000' length may also have been inspired by the limits on reel size on double system projectors although my own run 2000' with no problem.
Hey, some pretty good films there! Which did you work on?
http://us.imdb.com/Name?Mondshein,+Andrew
------------------
John P. Pytlak, Senior Technical Specialist
Worldwide Technical Services, Entertainment Imaging
Research Labs, Building 69, Room 7525A
Rochester, New York, 14650-1922 USA
Tel: +1 585 477 5325 Cell: +1 585 781 4036 Fax: +1 585 722 7243
E-Mail: john.pytlak@kodak.com
Web site: http://www.kodak.com/go/motion
You asked why reels aren't conformed to 2,000 foot lengths as a routine part of the post-production process. When I posed exactly the same question in the 'annoyingly short reels' thread several months ago, here was Bill Carter's reply:
quote:
Usually, the physical number of reels is "carved in stone" once the negative cutter begins conforming the camera negative. Changes may still be made within a reel, but footages per reel generally don't get rebalanced. Once the cutter has made certain shots "head" and "tail" shots for the various reels, that can be difficult to change. Major handling of camera negative like that is avoided as much as possible, because of the potential for wear and damage.
I only wish editors had always taken that line! I've recently been preparing a 3-reel 35mm documentary made in 1947 for preservation duping, and found the camera negative to be full of bad (and in some cases, not straight) joins, edge damage, V-cut perforations, rusting Lawley clips (steel clips which were an early device used to signal changes in printer light, which were supposed to be removed after printing has been completed) and even fingerprints on both surfaces.
With more and more movies being edited on non-linear video machines, I would think this sort of thing could be easily corrected. Let's hope.
Another complication could be foreign or alternative release versions. For example, if the BBFC (UK censors) demanded cuts to a scene, then I guess the way you'd do it is to edit the dupe neg which is used to strike the UK release prints. Take, say, 3-4 minutes of footage out of a reel that way and it could end up being annoyingly short.
Ironically, the worst offender I had towards the end of my time in the booth was Dancer in the Dark - 10 reels for just over two hours, but the original shooting was on video! So it wouldn't be a case of cutting the negative, because there'd be no negative to cut until the video editing was finished and a tape-to-film transfer was done. So why they then needed to produce 10 tiny reels I really don't know.
Mind you, it was worth all the effort to see Björk being hanged! 
Brad: Editors can and should consider the shipping ramifications. There aren't that many rules to follow. Aim for 1900 feet per shipping reel and don't begin an "a" reel or end a "b" reel with black frames.
As for "rush jobs," I didn't heard about them very often, but that doesn't mean they weren't common. They certainly could be more common today...digital editing has shortened the (already meager) post-production schedule on the average movie.
In film school (USC) we were taught to consider the number of reels and how shipping cans generally work (3 or 4 per can) and how it's not a great idea to end reels with black frames or fades (in or out). It's considered bad form, but that doesn't stop folks from doing it anyway. By the way, I worked with another editor who was considerate of the shipping and real-world projection ramifications...I just can't remember her name. The movie was never released commercially (it was called "omaha").
"Sphere" is a movie in recent memory that had reels beginning/ending in black.
"Scorpion King" is a current release with reel 1 ending and reel 2 beginning with black frames. I had to break-down and re-make the splice on one of our prints because the projectionist didn't read the notice that came with the print. I'm sure she wasn't the only one in the world...and I'm sure they won't all get fixed, either.
------------------
And, hey! Let's be careful out there.
~Manny.
Some video-to-film converters can't accept loads greater than 1000-feet. I suppose they could join two reels, but if the film was originated on video it's a good bet they couldn't afford a negative cutter.
------------------
And, hey! Let's be careful out there.
~Manny.
This CHELSEA WALLS *was* shot on video and transfered to film (which possibly accounts for the horrific quality of the image?). Ethan Hawke has been making the talk show circuites bragging about how he made this film for $100,000. It certainly looks it. It also might be that, given that the film has no direction, with scenes meandering on and on all over the place, Lion's Gate execs might have stepped in and insisted on some post production editing on their own, trimming down what might have been a few excruciatingly long (and pointless) scenes, hense the irrationally short reels.
You know how sometimes you sit in a theatre and want to yell out "Projectionist"? Well, with this film you sit in the theatre wanting to yell "EDITOR." Or perhaops just a simple moan...."Please lord, make it stop"
"Dancer in the Dark" (or as some have titled it "Dresses in the Dark") was another. It went back out with one reel empty and a note explaining about a missed splice and a shipping deadline.
More than one film comes in with reel three short. Sometimes not even 1000ft on the reel. Why? I can understand the last reel being short, but why #3? In a lot of cases, if the first five reels were full (2000ft or so) there would not even be a need for the sixth (or read first six and no need for the seventh, etc.).
Sometimes I have to pay shipping both in and out. Useless reels adding to the weight just irk me.
TWENTY reels. FIVE cans. 
'Das Boot: Director's Cut' was half an hour shorter and shipped on eleven reels.
-Aaron
For TES, we (usually) pay $55/print (that covers both directions), and for ETS, we pay zero, but our local delivery folks (FilmTrans) charge $107/month (not at all usage-sensitive). I don't know if there's much variation for other folks.
I guess the weights are factored in here somewhere in that if everyone started shipping 9-reel 3-can movies we'd see an increase, but it's not a direct or clearly visible thing. Also, I assume there's plenty of shipping cost that we don't see. Prints from Hollywood, Toronto, etc. have to make it to TES in Ohio somehow, and to whichever regional ETS depot. That cost has to fall on studios, right?
I do remember a few years back Technicolor raised the $55 rate up from $50 and sent a letter to that effect. Perhaps I should go dig it up. I think the excuse was rising jet fuel prices?
--jhawk
------------------
Film-Guard directions:
1.) Lather
2.) Rinse
3.) Repeat
***Do Not Ingest***
Brent
So over here at least, industry standards which put an end to the practice of cuttting short release print reels would certainly save cinemas money. But it would mean studios taking on an extra cost, so I can't see anything changing.
I guess the new policy ought to be "once the first 35mm print in ANY stage of production is struck, the reel changes may no longer be altered." Had they kept the movie on 7 reels and just had a couple of short reels, that never would have happened. Well, either that or if Deluxe had not have screwed up the reels and leaders on the re-edit print. But then again, the theater that ran it is also partially at fault because if they had've pre-screened it this would have been caught. Taking it one step further though, did the depot get the film to the theater the night before so they COULD pre-screen it? Maybe it's not the depot's fault because someone at Paramount gave orders to not allow the film to get there early? Maybe the depot wasn't involved at all and a courier was late? Hmmmmm. Who knows. Anyway, what a mess!