Posted by Brad Miller (Member # 2) on 08-28-2002, 02:12 PM:
 
Anyone running this automation? Supposedly there is a way to set this up for a "start cue". To explain, this way a cue is placed at the tail end of the leader and when the START button is pressed, the projector motor will run until the cue is reached, and then initiate the start sequence (7 second countdown/douser open/sound change/light change).

My theory was to set each automation into "interlock mode", but assign each screen a different sync number. That way the automation would *think* it is performing an interlock on every screen, but of course there would be no second projector running with it. I tried this on one machine, but got an error from the automation as it shut down right after the automation read the cue and opened the douser.

So has anyone here done this with a CNA-150 automation? I know there is a restriction of having 9 interlocks going on simultaneously, but in a 9 or less plex this should work fine.
 


Posted by Pete Naples (Member # 761) on 08-28-2002, 02:28 PM:
 
Probably the show logice needs to have more than one machine in a each sync loop, and as it doesn't assumes it's lost it's partner.

Never actually tried to get the CNA's to work this way, I've always just stuck with the show logic, and drummed it into the operators. However, I wander if a 'wait cue x ' command, right at the start would do it?
 


Posted by Brad Miller (Member # 2) on 08-28-2002, 02:49 PM:
 
quote:
"However, I wander if a 'wait cue x ' command, right at the start would do it?"

This is the first time I have had the chance to play with the CNA series of automations. Can the CNA-150 do this? I assume that works similar to a CA21's "delay" line?


 


Posted by Ken Lackner (Member # 1002) on 08-28-2002, 03:03 PM:
 
I have programmed and used the CNA-150 before, as well as read the manual. I could be mistaken, but I don't think there is a way to do what you are talking about. About the only thing you can do is program the delay time (it doesn't have to be 7 seconds, it can be as long as you want within a certain range). But once you press the Start button, it starts the countdown.


 


Posted by Pete Naples (Member # 761) on 08-28-2002, 05:09 PM:
 
Brad, never seen a CA21, so I can't help there.

I went straight from Cinemation to CNA!

I've never done a CNA150, we only use the CNA200, but I doubt they are radically different. Unless I'm misunderstanding the 'wait cue' command, then you should be able to achieve this.

Ken, if you REALLY program the CNA series, by over-riding what if I remember right is called show logic, you can make them do anything they are wired to do, it just gets more complex from a programming and cueing point of view.
 


Posted by Jean-Michel Grin (Member # 1360) on 08-28-2002, 07:43 PM:
 
Brad,

In My booth we use the CPA-10, the ancester of the CNA series. In "normal" mode, one print for each projector, a cue is placed at the tail end of the leader to open the douser. In interlock mode a second cue foil placed prior the cue at the tail end of the leader is necessary to initial show logic. And is important to set each automation for each interloking loop with the same sync. number and each projectors with different ID number. I've experienced the same problem with two CPA-10 they stop without reasons durring the show. the only cure was to exchange the entire automation in one console.

Sorry my English is really Bad, but I hope that you're understand me..

Sincerly,

------------------
Jean-Michel Grin - Europlex Cinemas (Switzerland)
 


Posted by Brad Miller (Member # 2) on 08-28-2002, 08:49 PM:
 
Ken, I know the CNA-150 can have it's start sequence timer set to any number I desire, but that is still not a "start cue". Doing that will still require that the operator thread to a certain frame on the leader. What ends up happening is the projector is threaded, then the projectionist kicks the motor switch on a couple of times as he gets the leader ran down to the point it needs to be...whether it is 7 seconds or 70 seconds. That is unnecessary murder on the motor and gears of the projector. Plus I still see people who roll it down too far and end up missing the start of the first of the film.

Why in the world people design automations without a start cue is just insane! This is the one feature that almost everyone I bump into or work with wants (or appreciates if they already have automations that have it).

Now I would welcome a "default countdown". The idea being that the projector motor will run until it hits the start cue, then 7 seconds from that point (which should be user adjustable) the douser will open and the show begins. However if after X number of seconds after the START button is pressed it does not see a start cue, it will automatically proceed with the show start sequence. Such a feature would be nice on the higher end automations out there, as that way if a cue missed on a timer start, the show would still run...just 30 or 60 seconds late (again, whatever the user set the default timer to). Of course, the xenon should never strike either until the start cue is read. No need to blast the xenon on the changeover while the leader runs down.


 


Posted by Ken Lackner (Member # 1002) on 08-28-2002, 08:57 PM:
 
quote:
Ken, I know the CNA-150 can have it's start sequence timer set to any number I desire, but that is still not a "start cue". Doing that will still require that the operator thread to a certain frame on the leader....

I understand what you are referring to. I was simply saying that you can change the delay if you want to.

quote:
Of course, the xenon should never strike either until the start cue is read. No need to blast the xenon on the changeover while the leader runs down.

I dissagree. Some times it may take a while for the lamp to strike and the arc to become stable. I don't know about you, but I want to make sure that the bulb is lit and producing steady light well before the dowswer opens.

 


Posted by Brad Miller (Member # 2) on 08-28-2002, 10:25 PM:
 
Ken, with a good lamphouse and a good xenon lamp that is not overran on hours, 7 seconds is plenty. Therein lies the disclaimer though...it must be GOOD equipment and no "el cheapo" bulbs.
 
Posted by Alan Gilbertson (Member # 242) on 08-29-2002, 08:14 PM:
 
Hi Brad,

We do this all the time with the CNA-200's because of the endless loop. I believe the 150's ar the same. THe cue on the leader call waiting for cue zereo, and as for the SYNC mode. Call that sync loop zereo and that doesn't even need to be up on the main screen. If this does'nt work let me know and I'll check it this week. Once we have it programed we never change it so I'm going off of memory.

Alan
 


Posted by Brad Miller (Member # 2) on 08-29-2002, 08:24 PM:
 
The CNA-200 is a completely different beast from the CNA-200 as far as I can tell. Plus, there is no "main screen" like the CNA-200 has.


 


Posted by Pat Moore (Member # 380) on 08-30-2002, 10:30 AM:
 
Brad -- you should be able to place a "Cue 0" as the first step of the program. Whether it's interlocked to other systems or not, the system runs motor and lamphouse but will wait for that cue before beginning it's show-open sequence.

Pat


 


Posted by Brad Miller (Member # 2) on 08-30-2002, 02:19 PM:
 
I guess I'm missing something here, but the douser is set to open 7 seconds after the START button is pressed. Exactly how would putting a "cue 0" 30 seconds into the leader prevent the douser from opening 7 seconds after starting the automation and wait for a cue instead?

Reminder: this is the CNA-150.


 


Posted by Alan Gilbertson (Member # 242) on 08-30-2002, 08:48 PM:
 
Hi Brad,

Waiting for cue zereo starts the sequence after that cue is read or at the time the cue is read. So you are running it just like interlock but you are only running the 1 projector. We use this at all of our location using both CNA's and Eprads Ultimations. It is very helpful with the endless loops as you don't know where they will stop.
 


Posted by Brad Miller (Member # 2) on 08-30-2002, 08:51 PM:
 
Can someone please explain HOW to add a "cue zero"? I'm getting a lot of tips here, but no directions on how to set it up. As far as I am aware, "cue zero" WILL happen 7 seconds after the START button is pressed (unless a longer delay has been set)...but that is still NOT a start cue. A start cue should be able to have the projector threaded at any point of the leader and the douser still open on that exact designated frame.


 


Posted by Pete Naples (Member # 761) on 08-30-2002, 09:39 PM:
 
I haven't got one handy or I'd go and try this.

I think if you add 'wait for cue 0' right at the start you will achieve what you are looking for.

Thinking about it, I can totally see where you are coming from. It's much the same as we 'real cinema' guys would look for a specific frame on the leader when we start the show.
 


Posted by Brad Miller (Member # 2) on 08-30-2002, 09:42 PM:
 
Ok, going back to the manual again (it's been a few days since I looked through it) are you saying that I should just remove "SR/MID1/FLAT" from the "0" cue and leave it for "NONSYNC/UP/FLAT"? If so, what is preventing that douser from opening 7 seconds after the START button is pressed?

I may still be missing something here, but I don't see how this applies to the CNA-150 model. Anyone who has done this with the CNA-150 please post the specific buttons you had to press and in what order to make this work so there is no more confusion.

Just so no one else will use this phrase, there is no button or control on the automation labeled "wait for cue zero". If there is, I must be going blind and the manual doesn't say anything about it. Upon looking at the CNA-200 manual (page 48 of the paper manual/52 of the pdf) there IS something called a "wait cue". I am certain this is what you fellas are talking about, but again that is ONLY on the CNA-200. I am working with CNA-150s here.

Damnit, this theater should have just bought CA21s. How aggravating. Anyone want to buy some CNA-150s?


 


Posted by Joe Redifer (Member # 3) on 08-30-2002, 11:29 PM:
 
Before you sell them you should review them for the site. Really. Why would anyone buy an automation without a start cue?
 
Posted by Pat Moore (Member # 380) on 08-31-2002, 09:53 AM:
 
Brad; I think you're already doing the right programming, maybe it's simpler than you think.

The CNA-150 has a built-in 7-second delay for C/O Open and Sound-to-Film (that delay is programmable in "Supervisory"). That's the most common programming I've seen that imitates the functions of most previous automations. Most programs I've seen only use cues 1, 2, 3, etc, with Cue 0 reserved for sync or continuous loop operation.

Make the Sync Loop -0-, which tells the system it is NOT in an interlock group with other projectors. Turn the SYNC switch ON and you will get the operation you want. Until Cue 0 is detected, the only thing that should happen is projector and lamp on. Once Cue 0 is detected then the show start sequence happens with that 7-second delay built in. Sync function is still available by changing the Sync Loop number.

We've replaced a few CA21's, but what happened to them I couldn't tell you. The theatre bought pretty nice automation systems and I think you'll find the 150 does about everything you're looking for. It's the CNA-200 that truly compares to the Australian-made CA21.

Hope that helps you,

Pat


 


Posted by Gordon McLeod (Member # 33) on 08-31-2002, 01:14 PM:
 
Buy a reel automation a cinemation MK IV
 
Posted by Brad Miller (Member # 2) on 08-31-2002, 01:18 PM:
 
quote:
"Make the Sync Loop -0-, which tells the system it is NOT in an interlock group with other projectors. Turn the SYNC switch ON and you will get the operation you want."

Ok, now that explanation makes sense. I will try it out later today. Thanks!
 


Posted by Joe Redifer (Member # 3) on 08-31-2002, 03:50 PM:
 
Brad if it is that simple I will buy your CNA-150's.
 
Posted by Brad Miller (Member # 2) on 08-31-2002, 04:09 PM:
 
Pat, does Strong have an "upgrade deal" of some sort? From the sounds of it, the CNA-200 is the machine I would be truly satisfied with. The CNA-150 will suffice if indeed the start cue works as you say it should, but that still doesn't give me automated fader control without having to do into the processors and "rig things". I assume the CNA-200 has this feature?

By the way, although I am adamantly against using any of the "cue learn" features on these automations for the potential of disaster when prints or trailers are changed, I do see a potential use for it when running video (since I can't put cues on the tape). Is there an easy way to tell the automation at X time and X time and X time do these commands? I think it is possible to manually type in those times via a computer hookup, but is it possible to do it right on the automation units themselves? (The idea of course is to hit PLAY on the vcr at the same time as hitting START on the automation with the failsafes disabled. In theory this would allow the automation to count down to bring up the house lights and switch back to non-sync and so forth.)


 


Posted by Mark Gulbrandsen (Member # 72) on 08-31-2002, 04:20 PM:
 
Gord, They HAD Cinemation at one of their locations!! I installed 5 CNA-150's in Aspen in June and they all worked perfect. Nota problem.
Mark


 


Posted by Richard Fowler (Member # 893) on 08-31-2002, 04:54 PM:
 
According to a former sales manager at Strong, the 150 was designed for a theatre circuit that desired a middle level in features and cost. No experience with them, only the older Eprad Ultimation series.
The past five years we have been very happy installing and distributing the the CA-21 and CA-21 CAPIO units with eproms set up for three types of projectors.
Richard Fowler
TVP-Theatre & Video Products Inc. www.tvpmiami.com

 
Posted by Joe Redifer (Member # 3) on 08-31-2002, 05:34 PM:
 
It does not appear that the CNA-200 has a remote fader function, judging by the manual.
 
Posted by Pete Naples (Member # 761) on 08-31-2002, 09:13 PM:
 
The CNA200 does have remote fader, it's in optional add on goodie.

Never used one but it sounds trick!
 


Posted by Brad Miller (Member # 2) on 09-01-2002, 03:43 AM:
 
...and thank you Pat! Indeed simply turning on the "sync" while leaving the sync group number set to 0 did the trick perfectly.
 
Posted by Pat Moore (Member # 380) on 09-01-2002, 04:33 PM:
 
Glad that worked, Brad.

Remote Volume Control is an option on the CNA-200's, currently not on the 150 or 100. The 150 would be the next to get the capability but the market (such as it is) hasn't required it.

The 150 is a "mid line" package that was designed around Regal Cinemas requirements, though we certainly package them for other customers as well. We were coupling them with a digitally controlled dimmer that was actually a device on the automation's local network. A controller interfaces to power modules (up to four circuits)which handle the lighting load. That (QDC-series) digital dimmer works with either the 150 or 200. Any of the CineNet systems work with standard dimmers.

RE: "Cue Learn". I've found this is a "love it or hate it" feature. While I understand Brad's outlook, I have operators that don't put cues on the film at all -- they run a memorized program full time. They watch the show on the first run, inputting cues where required, and then run "learned" after that. The memorized cue times can always be adjusted if your first cue input is a little off. As long as a good projectionist threads up pretty close to the same place on the countdown leader, the shows run exactly the same each time with no cue tape problems. I have a couple of circuits that do that in SE Asia as well. They have less trouble doing that than remembering to "learn" a new program the first time a new movie runs.

As for a "trade-up" program, something can usually be worked out, depending on the dealer and how old these systems are. Since the system is modular, you'd just be replacing the controller section -- the termination boards that "talk" to the outside world are the same for all the CineNet systems.

Have a great rest-of-the-weekend...

PMoore
 


Posted by Brad Miller (Member # 2) on 09-01-2002, 04:48 PM:
 
Note to Pat...add page in manual regarding "start cues".

The theater these are in does have the digitally controlled dimmer, which is very convenient for fine tuning light levels. Kudos on that one!

I forget the model of the cue detectors, but they are the standard "stock" failsafes that are usually installed with these automations and according to the staff has NEVER missed a cue. I find it far more time consuming to manually cue the program, and potentially edit it if the cue input isn't done at the correct moment. Plus, if the cue detectors don't miss, who needs it? I am growing quite fond of them because they are factory designed to scan the SDDS tracks of the film for cues, and not in the picture area. Again, kudos for that one too!

Still in regards to the timed cues, can you address my questions on it above? I am going to end up using it with some video shows where the timed cues will be handy.


 


Posted by Brad Miller (Member # 2) on 09-02-2002, 03:41 AM:
 
Hi Pat,

In addition to answering my queries in regards to timed cues above, it seems there is a flaw in your advice via the "sync loop 0 / sync on" mode.

First show of the day...all works perfect.

Second show of the day...all works perfect, BUT the status panels never say when the film has stopped. The green run light just stays lit even after the show is over. Upon inspecting the projector, the projector and lamphouse have done a normal shutdown, but the automation says "RUNNING" and has "cue 4" displayed where there is no such things as cue 3.

Here is the show programming:
CUE 0 - SR / MID1
CUE 1 - DIGITAL / DOWN
CUE 2 - DIGITAL / MID2
CUE 3 - NON-SYNC / UP / SHOW END

Any ideas? The only way to clear it so that another show can be ran is to press STOP then CUE INPUT.


 


Posted by Brad Miller (Member # 2) on 09-03-2002, 02:53 PM:
 
*bump*
 
Posted by Brad Miller (Member # 2) on 09-04-2002, 01:56 PM:
 
Ummmm, there has to be SOMEONE that works for Eprad or Strong that can address this quirk with the CNA-150.
 
Posted by Ken Lackner (Member # 1002) on 09-04-2002, 03:43 PM:
 
Brad: When in Sync Mode, if you are actually syncing and the sync loop is not 0, I believe all the units will say "running" until the last one in the chain reads the shutdown cue. I know you are not actually syncing here, but what happens when the last show of the day drops? Then do they all go back to 0? My guess is that they would.
 
Posted by Brad Miller (Member # 2) on 09-04-2002, 07:11 PM:
 
What you say makes perfect sense, but I wouldn't know as just like
any booth when the movies start to drop for the night, the operator starts
powering each unit down.  By the way, I am running in sync loop "0".


Pat?  Rick?  Brian?  Hello? 


 


Posted by Ken Lackner (Member # 1002) on 09-04-2002, 07:58 PM:
 
So next time you close, perform an experiment. Leave them all on until the last one drops. Or do the test with a few trailer packs running on, say, 3 or 4 machines. (Not that any of this will solve your problem. I'm just very curious. )
 
Posted by Rick Sanjurjo (Member # 1365) on 09-06-2002, 07:54 AM:
 
Brad,

I have tried and two other people have tried running programs, both in sync loop 0 and on other sync loop numbers and have not had any problems as long as there have been no other units on the same sync loop number. The problem maybe a bug in an older software revesion, could you tell me what version software is running.

Rick
 


Posted by Alan Gilbertson (Member # 242) on 09-06-2002, 01:16 PM:
 
Jay or Tom at Eprad I'm sure can give you the answer or answers right away.
(419)666-3266
 
Posted by Brad Miller (Member # 2) on 09-07-2002, 04:22 AM:
 
quote:
" I know you are not actually syncing here, but what happens when the last show of the day drops? Then do they all go back to 0? My guess is that they would."

You are indeed correct Ken. I had the booth intentionally left powered on and nothing touched for the final round and as soon as the last projector dropped, all of them stopped "running".

I am going to go through all of the units tomorrow and make sure they are assigned properly. I forgot to get the software version off of them today. I'll do that tomorrow.


 


Posted by Brad Miller (Member # 2) on 09-08-2002, 02:06 PM:
 
Ok, all of the units are ID'd properly and the software is revision 3.050

Help, please, someone?


 


Posted by Brad Miller (Member # 2) on 09-10-2002, 03:53 AM:
 
Well guessey what started today. One of the automations (in the big house of course) started spazzing out and decided to stop a show randomly during the feature! Yes indeedy, there's nothing like renting out an auditorium for an important screening and the damned automation stops the projector THREE TIMES in the middle of the movie!!! Rather than quoting what was said, let's just say this did not make people happy and I have them running that screen completely manual now.

But that's not all, now another unit is randomly missing cues as of yesterday.

Pat, Rick, whoever...something has got to be done as this theater has had constant problems ever since it opened. In speaking to the manager and projectionist that has been there from the opening, not one day has gone by where all of the automations have worked properly. These are only 1 year old. What is this saying about the product??? Is this just a bad batch of lemons and the rest of the CNA line of automations are reliable, or does this sort of nonsense happen with all of these automations? Help me out here. This needs to be remedied, and after what happened tonight, this needs to be remedied immediately. What can and will Strong do to back their product and fix this situation?


 


Posted by Jean-Michel Grin (Member # 1360) on 09-10-2002, 04:48 AM:
 
Brad,

I experienced the same problem with two projectors in Interlock mode. One of the CPA-10 stopped 3 time the show during the feature
I'm disapointed of theses automation from Strong for theses sporadic malfunction.
In hope that you can find a solution

Good luck !

sincerly yours,

------------------
Jean-Michel Grin - Europlex Cinemas (Switzerland)
 


Posted by Brad Miller (Member # 2) on 09-10-2002, 05:00 AM:
 
Hey, I'll go in there and pull the interlock wires if Strong thinks that will fix the problem. Overall I just have not been impressed with the CNA-150s due to their lack of programmability, non-user friendly layout, no fader control, no start cue circuit that works reliably, no programmable delay lines, and now sporadic random stopping in mid-performance. Plus, I have yet to receive resolving support from Strong on these issues and the projectors never stop "running" when the show is over.

If these issues cannot be addressed and resolved within a reasonable time frame, I am ready to throw in the towel on the CNA line of automations, get the money refunded and buy CA-21s. The CA-21s will do everything this theater needs with reliability, and if needed, support from Pennywise.


 


Posted by Rick Sanjurjo (Member # 1365) on 09-10-2002, 01:19 PM:
 
Brad,

The problems you describe are consistent with having multiple units on the same sync ID number or having the sync wires reversed or not properly terminated somewhere in the loop. The sync number issue is not only on the automations but also on the status boxes. All items connected to the loop have to have different syn ID numbers. You can trouble shoot it by disconnecting the units from the sync lines and seeing if the problems goes away, if so you have identified the problem. The current version of software is 3.080 and that might explain why we can’t recreate your starting in interlock problem at the office, the dealer you bought the automations from should be able to get you the upgrade on the software. Your interlock problems could also be related to the sync wiring or ID issue.

As far as timers and cue wait instruction goes, someone didn’t purchase the correct automation for their application. The CNA-200 is what you need to get the features you require, the CNA-150 is a lower cost unit and was not designed to give the functionality you are looking for, a little bit of research or a phone call before the purchase of the units would have been prudent.

Hope I have helped

Rick

 


Posted by Sean McKinnon (Member # 612) on 09-11-2002, 11:44 PM:
 
Brad if it stays "Waiting for cue 4" can't you just add another cue after your normal shutdown cue?

------------------
--Sean McKinnon
Manager
Loews Cineplex Entertainment
Freshpond Mall 10
Cambridge, Mass
<A HREF="http://www.enjoytheshow.com" TARGET=_blank>www.enjoytheshow.com</A>
 


Posted by Brad Miller (Member # 2) on 09-12-2002, 12:51 AM:
 
No, once you input "end show" into one of the cues, it will ignore all further cues.

Strong is sending me current firmware. Hopefully that will fix it, as I have already checked the ID numbers of each projector and status panel and that isn't the problem.
 


Posted by Robb Johnston (Member # 239) on 09-15-2002, 01:11 PM:
 
2 items, and they are really grasping at straws.

I know that on the CNA 100 units there is a dip switch setting for run to end of show as opposed to running for a preset time from the last cue then turning off, ehether or not the film had run out of the projector. I know of a house where this was not in use and if the automation was stopped before the programmed time had elapsed from the end cue, it would stay looking for the cue after the end cue until they pressed start again. I guess part of the logic is that the lack of presence is read as a cue after the "end cue." Once start was pressed, the remaining time ran off and it went to cue 0. changing the dip switch for run to end of show eliminated the problem.

Another thought, what would happen if you took the projector out of sync mode between shows for a moment and then put it back in.
 


Posted by Brad Miller (Member # 2) on 09-15-2002, 02:48 PM:
 
I've already tried the dip switch setting, just for kicks. (I'm grasping at straws too.)

I have also taken the units out of sync mode to see if that was causing the random glitching. If anything, it got worse. Last night was automation hell night. Had a machine stop dead in the middle of the movie. Had another that was doing all sorts of weird things, so the projectionist was running it manually...but it still decided to switch to non-sync during the movie. LOTS of money in refunds just last night, but this has been happening since the theater opened.

I am patiently waiting the new firmware hoping it will solve these problems. I would expect it to arrive the first part of this week.


 


Posted by Pete Naples (Member # 761) on 09-15-2002, 05:39 PM:
 
We've found all the Strong automations can be very sensitive to RFI. It might be worth your while to check the grounding arrangement, really the CNA needs a dedicated, clean earth.

When it stops, does it tell you anything or does it simply stop?
 


Posted by Brad Miller (Member # 2) on 09-15-2002, 05:43 PM:
 
I got that tip last night from a fellow member. I will be checking on that and running leads if I find they are not there.

When it stops or something goes screwy like a douser closing or sound changing to non-sync, there is no warning. The automation just says "start in 00:00" or "running".


 


Posted by Pat Moore (Member # 380) on 09-15-2002, 08:25 PM:
 
Brad;

You better let me know where this theatre is. This thread started with "I'd like to have this start cue ability". Now you've had "automation hell night" and it sounds like nothing's ever worked right in the theatre. Certainly we at Strong would have heard something about this theatre by now. There are a LOT (I mean thousands) of CineNet systems running along just fine out there so if you've got a place where there are troubles, we'd like to know about it.

Thanks,

Pat
 


Posted by Brad Miller (Member # 2) on 09-15-2002, 08:28 PM:
 
Pat, I've already spoken to Rick last week regarding this as well as some of the other issues with the package of Strong equipment they have there. Rick is sending me something for the platters and sales is sending me new firmware for the automations. When I get the box and check the grounding issues, we'll take it from there. Something this odd has got to be something simple.


 