Moving Image Technologies would like to take this opportunity to review our new console design with the people that will be using it the projectionists and technicians of the world. We have been fortunate to be able to start from a clean slate to incorporate many of the contemporary features/improvements/suggestions that have been made to us since we have started this endeavor as well as from our own personal experiences in the booth. The result so far (we think), is an elegant design in simplicity, symmetry and functionality. We look forward to your comments and suggestions, and although we may not be able to implement everyones suggestions into the products, we certainly appreciate your participation and will consider them all.
[Console shown with doors removed.]




Integrated two-piece cabinet design - separable for lamphouse only requirements or ease of handling for difficult booth locations/installations.
Narrow, 21 inch width footprint - useful for going into side-by-side digital/film installations or cramped booths.
Lamp is replaceable from either side of the console/lamphouse, with no tools required knob/clamp mechanisms on each end of the lamp.
All doors are reversible, allowing them to open front-to-back or back-to-front.
Dual hour meters, one for cumulative system hours and one re-settable meter for lamp hours.
Air intake from the rear of the console permits use of an air filter (if desired) airflow sensor paddle switches will signal if the filter does get dirty.
High reactance power supply using all 150A, positive SCRs and ripple reducing filters on the DC output.
Innovative '5-speed' power tap shift design similar to a stick shift on a car, no clutch required but the power should be off to prevent arcing.
6RU of rack space from the operator side or rear of the console not concurrently but provides the capability to mount automation or other electronics from the rear of the console.
Up to 21 breakers, (14 optional, UL 489 branch-rated breakers) for those customers who like to do power distribution in the console.
Concealed internal wiring, routing via ducts and channels to minimize cable exposure cleaner look, just because we could.
14 inch nickel reflector for all wattages, multi-layer dichroic coatings with optional secondary IR/UV filter for wattages over 4kW.
High precision motorized or manual lamp focus options.
IREM A/C igniter with auto-strike circuit.
Dual color (Green/Red) LED status indicators for independent monitoring of interlock points, system ready and three phase input voltages simple green = good, red = bad indication of interlocks and power status.
115VAC @ 10A output winding from the power supply transformer convenient for export applications.
24VDC @ 2A output from the power supply for automation and interlock no more 115v or 230v interlock circuits or separate supplies required.
Status outputs for future remote monitoring of the system (interlock, power, wattage, hours, etc) - future network monitoring of lamp hours and error messages.
Four configurations, 2-3kW and 4-7kW for 230V or 415V, 50/60Hz.
Separate ducting paths for signal, control and power wiring.
Co-axial alignment of main blower and optical path cooling design provides cooling to the front ferrule of the lamp for all wattages.
Convenience outlets on both operator and non-operator sides.
[ 10-23-2003, 10:04 PM: Message edited by: Bevan Wright ]
Posted by Joe Redifer (Member # 3) on 10-21-2003, 04:07 PM:
From what I can tell so far it sounds good. I'm sure Brad will have a suggestion or 2 (or 3, or 40). But I do find one aspect especially interesting:
quote:
The list above had the following item:
Lamp is replaceable from either side of the console/lamphouse, with no tools required knob/clamp mechanisms on each end of the lamp.
What kind of bulb will this take? Will MiT manufacture the bulbs or should one stick with the Christie bulbs?
Posted by John Pytlak (Member # 331) on 10-21-2003, 04:11 PM:
quote:
High precision motorized or manual lamp focus options.
Do many theatres actually use the motorized lamp focus option to automate adjustment of the light distribution between scope and flat?
quote:
Air intake from the rear of the console permits use of an air filter (if desired) airflow sensor paddle switches will signal if the filter does get dirty.
I assume this would allow using cooling air source from outside the projection room? Great idea.
quote:
14 inch nickel reflector for all wattages, multi-layer dichroic coatings with optional secondary IR/UV filter for wattages over 4kW.
Hope you really keep that metal mirror cool to maintain efficiency in removing heat energy. The secondary UV/IR filter should reflect the heat to an efficient heat sink that is also well cooled.
quote:
knob/clamp mechanisms on each end of the lamp.
Great idea, but how do you keep them from getting stuck after hundreds of hours of heat and corrosion?
quote:
High reactance power supply using all 150A, positive SCRs and ripple reducing filters on the DC output.
Don't cut corners on the power supply. Go for the lowest ripple possible. Will only 3-phase units be available, even for smaller lamps?
Posted by Bevan Wright (Member # 1884) on 10-21-2003, 04:37 PM:
Joe - Any lamp type, standard will be HTP but adaptors can be made for any type.
John - Yes, quite a few theatres use the automatic flat/scope correction but that is Christie patented, MiT will not be doing automatic adjustment of the lamp.
Clean nickel plating and considerable electrical/mechanical contact will prevent sticking.
We are only doing three phase 2-7kw supplies, low ripple (for a linear supply) and high reliability is the goal.
Posted by Brad Miller (Member # 2) on 10-21-2003, 04:59 PM:
Not much to improve on here. For what it's worth...
I would like to see a nice bright work light at the top of the rectifier half of the console. It would make servicing easier.
Is it possible to implement a 20 minute time delay relay circuit for the internal lamphouse blowers as well as a feed to a rooftop exhaust out of the console? I think if such a thing was built into the console, that more theaters would benefit from proper cool-down cycles. Tremendous savings in bulb cost would be saved.
A manual projector motor bypass switch would be nice. Could fit in one of the optional breaker spots.
Could the lamphouse be designed in such a way so that it could mount directly to a standard pedestal (perhaps with an adaptor bracket)? That would make the system even more attractive for future resale value.
How about having a quick connect system between the lamphouse and rectifier units? The idea here being that, for example a 10 plex could purchase 10 consoles and 1 extra rollaround rectifier. Should the rectifier go down, the projectionist could remove the back panel, disconnect the quick connect to the lamphouse and wheel up the rollaround rectifier and keep the shows running. This would probably take two connections and may end up driving the cost up a bit, but who wouldn't want that kind of security of not losing a show without the unreliability of the switchers? Plus it would be wonderful for troubleshooting issues over the phone before driving out to the theater.
That's about all I can think of to add. The machine looks to be very well thought out.
When will the first ones be available?
Posted by Scott Norwood (Member # 30) on 10-21-2003, 05:08 PM:
Looks good. A couple of quick points:
- be careful with the dual-color LEDs; those of us with red/green colorblindness would probably prefer to have separate LEDs rather than a single one which changes color
- there should be some place or under the lamphouse to store the long-handled Allen wrench or whatever other tool is needed to align the lamp (maybe there already is one in the existing design)
- will there be a viewing porthole (like on the Strong Super Lume-X and on all arc lamps) so that one can view the bulb in operation? this isn't necessary, but is nice to have and probably doesn't increase the cost significantly.
- the dual hour meters sound like a great idea; hopefully there will also be a slot on the back of the lamphouse for the usual card to record hours and dates of lamp changes
- it would be nice if the douser handle(s) were operable from either side of the lamphouse for changeover installations
Posted by Gordon McLeod (Member # 33) on 10-21-2003, 05:30 PM:
An Ac recepticle on the non operating side of the machine front for the framing lamp so the cable doesn't have to snake around under the machine
A lot of excess noise supression for the ignitor circuit IREMS tend to be a bit noisy causing interference A good veiwport in the side or front to see the arc clearly
The dowser blade being of sufficient mass to allow the lamp to be left on with the dowser closed for extended periods as in a changeover preview house
What serries of lamps is it designed around the HS or the HTP
Also a plenum through the doors or a baffle to prevent the sides getting very hot
Posted by Bevan Wright (Member # 1884) on 10-21-2003, 05:50 PM:
Brad - the supply has hinged doors that open to give you clear access to any servicable items in the supply - and they are all over-rated for very long service life.
We'll have to look into the regulatory issues around the delay relay concept.
Manual control panel can be added in the 19RU space if the automation doesn't have this provision (like CA21).
Lamphouse will mount directly to a standard pedestal with an optional adaptor plate.
Taking into consideration cost and connection reliablity we opted for the higher rated components and fewer connections - better if it never fails, right?
First units should be rolling out in February.
Scott - Green/Red, good point. We will make sure there is significant level differences between the two.
Pocket for manuals/tools/lamp card can be located on any of the three 'same-sized' access doors (lamphouse and operator side power supply access doors are all the same).
The reversible feature on the doors may make the arc camera-obscura feature difficult if not impossible... let us check.
Posted by Steve Guttag (Member # 268) on 10-21-2003, 05:55 PM:
I do like the control circuit idea for a roof-top blower! Some lamphouse manufactuers use a thermal switch to turn off their internal blowers...that may be an idea. Personally, I just like the blowers to run when there is power applied.
Steve
Posted by Jason Burroughs (Member # 68) on 10-21-2003, 06:09 PM:
I would suggest that all breakers be connected to the main via a contactor controlled by a simple press button, much like the CFS/Rentec consoles. This would simplify power-up and down procedures, less wear and tear on breakers (which aren't really designed to be switches any ways). This would also allow for the delay that Brad mentioned (again like the CFS/Rentec consoles).
One thing that has suprised me, is that no one has put a rectifier on a sliding tray type platform, such that in the event that service is needed it could be slid partially out of the console. This would make some parts MUCH easier to get to.
Modular Plugs for common service items such as rectifiers and ignighters. This would make emergency replacment easiser and faster. Even non technicaly inclined operators could perform these tasks.
Deffinatly an Amp/Volt meter - always hated the Amp only meters.
A viewing window for the Arc - such as that Strong provides - this can make diagnosing a bulb easier, as well as easier to see bulb condition.
Squirrel cage type blowers for the rectifiers, those muffin fans just don't seem to hold up very well.
Posted by Joe Redifer (Member # 3) on 10-21-2003, 06:31 PM:
I agree with Brad about the internal work light and the 20 minute cool down feature.
I don't know how your rectifier will be laid out, but I hope the diodes are easy to access. Hopefully they'd never (or rarely) need to be changed.
Posted by Brad Miller (Member # 2) on 10-21-2003, 08:31 PM:
Oooooooooooooh, YES!!!
quote:
One thing that has suprised me, is that no one has put a rectifier on a sliding tray type platform, such that in the event that service is needed it could be slid partially out of the console. This would make some parts MUCH easier to get to.
That would be WONDERFUL if you could do that one Bevan!
I agree on the amp/volt meter as well as using squirrel cage blowers if possible too. The central contactor "one button power on/off" idea makes things nice and idiot proof too. Those would be welcome improvements.
Posted by Jason Burroughs (Member # 68) on 10-21-2003, 09:11 PM:
RE: Arc viewing window
This window could be placed on the front bulkhead, avoiding problems with interchangable doors. The Cinemaccanica consoles have them in this location, viewing the arc is very easy.
On the note of rectifier blowers, I would tie them into the failsafes of the other vane switches, like the exhaust, so that if that blower ever stops, its not left that way, its not always obvous that a blower has gone out untill its too late.
Is the bulb/reflector assemply going to be on a sliding tray for 35/70mm operations?
Posted by Mark Gulbrandsen (Member # 72) on 10-21-2003, 09:19 PM:
Bevan,
Looks really good so far.... But I would think about these.....
1. I like the one switch contactor idea for sure. Many other console manufacturers offer it too.
2. Forget the IREM ignitor and come up with something thats more reliable and a tad less expensive to maintain....Can't tell you how many IREM's I've replaced over the years....generally they are not repairable. I really don't want to see someone elses electrical equipment in a new design console....gains you absolutly nothing in the new idea area so far as the ignitor is concerned. I've had to replace very few Christie ignitors.....What ever you go with, make it completely REPAIRABLE in the field!!!! Don't pot anything in place!
3. Use 150 amp stud mount diodes instead of SCR's. With SCR's you'll get absolutely nothing. Use real heatsinks instead of a flat sheet of alumnium that does absolutely nothing. Go to a real heatsink manufacturer and have them calculate in real world terms what you'd need to be able to cool it reliably by convection only. I don't want to see a dust impaction fan
under the heatsinks.
4. The rectifier on a rack slides or equivelent is one of the best ideas brought up here.
5. Use a very good calibratable DC ammeter, I prefer digital personally but a good analog would be ok.
6. Include a cheap scissors jack built into the tilt mechanism. Strong does this on the X-90, makes tilt adjustments by one person a snap!
7. Although the Align-O-Tron is available make available an inexpensive laser alignment rig specifically for your lamphouse/consoles.
8. Offer it as either a console or seperate Lamp/Rectifier.
9. Mirror size is irrelevant. Its gotta be as good or better than the present Chrisite mirror offering or your wasting your time and effort.
.
Mark @ CLACO
Posted by John Pytlak (Member # 331) on 10-21-2003, 09:48 PM:
I agree with the comments that the dowser needs to be able to take the heat from being closed for extended periods. Some theatres and screening rooms may still run 20 minute reels with changeovers, and want to leave the lamps on. Likewise, screening rooms often leave the lamps on during the entire workday.
A motorized dowser that can be connected to automation or remote control would be a useful option.
Could a laser alignment source be precisely and permanently mounted BEHIND the reflector, pointing toward the lens and screen, for a really convenient check of alignment anytime the lamp is removed?
Posted by Bevan Wright (Member # 1884) on 10-21-2003, 11:58 PM:
Jason - Analog amp/volt meter - yes. Three phase voltage presence and P.S. fan 'on' are part of the interlock.
Power supply accessibility obviously key - I'll post the assembly drawing for the power supply shortly.
Hand douser will be continuous duty rated.
Posted by Aaron Sisemore (Member # 145) on 10-22-2003, 12:06 AM:
So far this new product looks promising!!!
The resettable 'trip meter' for the lamp hours is a genuis move! It is about time someone did that!
Some of the other mentioned ideas I will second or add to:
I like the idea of the sliding platform for the power supply, and having a way to 'quick-disconnect' the supply for emergency change-outs.
If you do go with squirrel-cage blowers, PLEASE let them be ball-bearing types!
Also allow for the blowers to be in the standalone (non-console) rectifier as well.
Overrate the power semiconductors in the power supply as much as economically possible, and place them on ROBUST, EFFICIENT heat sinks with forced-air cooling (see my comments on the fans above).
Place the heat sink in a manner where if the power semis have to be replaced, it can be done with a minimum of muscle and cursing
-Aaron
Posted by Michael Schaffer (Member # 1204) on 10-22-2003, 01:56 AM:
quote:
Concealed internal wiring, routing via ducts and channels to minimize cable exposure cleaner look, just because we could.
What if the worst happens and some of the cables have to be replaced?
Sliding out the whole power supply might be very difficult. They tend to be on the heavy side. But maybe a diode board that swings out?
Wouldn`t positioning the lamp further back in the lamphouse plus a deeper reflector increase the potential light output?
quote:
Could a laser alignment source be precisely and permanently mounted BEHIND the reflector, pointing toward the lens and screen, for a really convenient check of alignment anytime the lamp is removed?
That is a great idea. It wouldn`t really have to be permanent though if there is a holder which accepts the laser source or mabye different adapters (like for mounting the Align-O-Tron or other devices).
Posted by Bevan Wright (Member # 1884) on 10-22-2003, 08:32 AM:
Gordon - the lamphouse doors have heat shields on them, we will add a few louvers to get air from the rear plenum to move between the door and the sheild to keep the sides cool. Front AC recepticle is being moved. HTP will be the standard offering but the rear support adaptor can be changed easily for HS type.
Michael - The cabling is still accessible it is just routed up the side channels and down the center support/duct, not fully enclosed. The control board on the power supply is hinged to provide complete access to the serviceable items in the supply. The reflector f# is matched to modern lenses, we will have no problem competing on light output.
Posted by Brad Miller (Member # 2) on 10-22-2003, 12:26 PM:
quote:
Front AC recepticle is being moved.
I rather liked having an operator side convenience outlet. It gives me a convenient place to plug in my laptop and scope. Can you keep it and just add a second one on the non-operator side?
Posted by Gordon McLeod (Member # 33) on 10-22-2003, 02:29 PM:
Brad I always plug the scope/laptop into the audio rack wireing less chance of a nasty spike
I have had to replace very few of the IREM ignitors but they are noisey
I like the idea of an SCR rectifier SANREX has built there ones with a 3 phase SCR bridge for years with very few failures and they give you lots of options on variable output control even an easy way to do standybye mode
On the sizer jack I have sound that they tended to make the console a little less rigid tending for more vibration to show up on the screen even when clamped down
Alos a good idea is to allow correct working distance on the front so many of the european projectors could be fitted on as with the soundhead at the back can be difficult on most north american consoles
Posted by Michael Schaffer (Member # 1204) on 10-22-2003, 02:56 PM:
All that sounds very promising. What about the laser alignment tool idea?
Posted by Bevan Wright (Member # 1884) on 10-22-2003, 04:02 PM:
Brad/Gordon- How about we move the operator side outlet down and closer to center on the console, next to the row of knock-outs?
Michael - We are looking into a simple diode laser fixture.
Posted by Gordon McLeod (Member # 33) on 10-22-2003, 09:26 PM:
Sounds good to me
Posted by Bevan Wright (Member # 1884) on 01-01-2004, 08:29 PM:
Update
MiT would like to thank all the participants who provided some great ideas and suggestions to the XLC console development. Look for units in the field in the next couple of months ... and make sure to visit our booth at ShoWest.



Steel uni-body construction, textured powder coat (blue-frame/grey-doors) finish - [the two-piece concept proved a bit too pricey to be practical. Decision was made to go with a more conventional design, as the console is smaller it will be easier to maneuver, and the power supply can easily be removed if desired. We will still offer the lamphouse-only as a separate option.]
Narrow, 21in [533.4mm] width footprint [For going in next to digital systems or fitting better into cramped booth spaces.]
Lamp is replaceable from either side of the console, with no tools required [Integral clamping levers.]
All doors are reversible, allowing them to open front-to-back or back-to-front
Dual hour meters, one for cumulative system hours and one re-settable meter for lamp hours [Lamp hour card still present in inside door pocket for tracking history.]
Air intake from the rear of the console permits use of an air filter (if desired) and ducted intake lowers console noise level
High-efficiency linear power supply using all 100A, positive SCRs on large aluminum heatsink banks and ripple reducing choke/filters on the DC output
Hinged power supply access doors provides easy access to all internal components
Solid-state interlock circuit
Robust '5-speed' power tap switch design
6RU of rack space from the operator side or rear of the console
Up to 21 breakers, (14 optional, UL 489 branch-rated breakers with master contactor switch)
Concealed internal wiring, routing via ducts and channels to minimize cable exposure
14in [355.6mm] nickel reflector for all wattages, multi-layer dichroic coatings with optional secondary IR/UV filter
Motorized lamp focus with defeat switch standard
13 degree downward tilt
IREM A/C igniter with auto-strike circuit
Anode cooling ducts for all wattages
LED status indicators for independent monitoring of interlock points, system ready and three phase input phases
Dedicated 115VAC output winding from the power supply transformer [No external transformer required for export usage.]
Status outputs for future remote monitoring of the system (interlock, power, wattage, hours, etc)
Four configurations, 2-3kW and 4-7kW for 230V or 415V, 50/60Hz
Two 10A convenience outlets
Separate ducting paths for signal, control and power wiring
Internal work light
Designed for HTP lamps (HS with optional rear adaptor)
Continuous-rated douser with ceramic shield, configurable for left or right-side operation
Mounting provisions for 4" locking casters (optional)
Mounting provisions for secondary IR/UV filter(optional)
Now on to the platter ....
Posted by Andrew McCrea (Member # 674) on 01-01-2004, 09:03 PM:
Hopefully this isn't too late, and I don't know much about the specific technical details, but what about incorporating the 1/2 power xenon lamp during changeovers, intermissions, etc. This was that feature that was very advanced for its time in the XEBEX lamphouses.
I just thought this might be a good idea because it allows projectionists doing changeovers to save their Xenons.
Posted by Bevan Wright (Member # 1884) on 01-01-2004, 09:31 PM:
Andrew,
The SCRs will allow us to do just that, although the first incarnation will just be on/off - replacing the typical three phase contactor with a solid-state control.
Posted by Steve Guttag (Member # 268) on 01-01-2004, 10:06 PM:
Bevan:
Going with SCRs instead of conventional diodes, eh?
Looks like you all took a lot of suggestions to heart.
Steve
Posted by Michael Schaffer (Member # 1204) on 01-28-2004, 04:01 AM:
I forgot to ask when this topic was still hot, what are the advantages/disadvantages of SCRs vs good old diodes?
Posted by Bevan Wright (Member # 1884) on 01-28-2004, 11:14 AM:
The SCRs allow us two things...
1) to get rid of the three phase contactor and a bunch of high current connections. The SCRs in the initial version will be simply ON or OFF depending on the interlock and the on/off switch or automation.
2) a future phase controlled version of the control board will allow us continuous output current control and a stand-by mode - like a Sanrex.
Posted by John Pytlak (Member # 331) on 01-28-2004, 11:49 AM:
Hopefully any safety (door) interlocks cut off ALL power, and aren't just switching off the SCRs.
Posted by Paul Konen (Member # 41) on 01-01-2005, 12:41 AM:
The only comment that I have is the pedestal should have a removable access panel on the top of the base for connecting the conduit.
Posted by Bevan Wright (Member # 1884) on 01-01-2005, 05:12 PM:
Yes, we are putting that cover back. Didn't think it was going to be necessary as the front foot is short... guess most electricians have big hands.