Film-Tech Cinema Systems
Film-Tech Forum ARCHIVE


  
my profile | my password | search | faq & rules | forum home
  next oldest topic   next newest topic
» Film-Tech Forum ARCHIVE   » Operations   » Film Handlers' Forum   » 2-Proj. automation (Page 2)

 
This topic comprises 3 pages: 1  2  3 
 
Author Topic: 2-Proj. automation
Ken McFall
Jedi Master Film Handler

Posts: 615
From: Haringey, London.
Registered: Apr 2001


 - posted 11-10-2002 10:36 AM      Profile for Ken McFall   Email Ken McFall   Send New Private Message       Edit/Delete Post 
Fine that may work with a lot of mods to the projector shutter wiring... but you are also disabling event 5, film runout event.

But it's not what you said in your orignal post.

========================================================
Component engineering TA10 will do this in it's virgin state, with a very few mods
========================================================

You made no mention of buying another TA10!! So effectivly everyone else on here is correct the TA10 will not run two projectors on automation. If they want to buy two automations then fine....

By not using event 5 you are removing some of the functionality of the unit.

The mods required would involve quite a bit of work on the C/O shutter wiring in the projector(s) to prevent the TA10 from closing the outgoing machines shutter as the incoming machine started. (For info the TA10 pulses the C/O shutter closed as the projector starts
Also what do you do with your lighting etc. You are effectivly taking a lot away from the automation due to the way the TA10 works.
If you want to run the show manually then do so and save a lot of money....

So it's not a plug in and go solution. Take into account an engineers time and the second TA10 and the costs mount considerably.

I am a great fan of the TA10 as you know but don't think disabling a large part of it is a solution.....


 |  IP: Logged

Mark Gulbrandsen
Resident Trollmaster

Posts: 16657
From: Music City
Registered: Jun 99


 - posted 11-10-2002 10:41 AM      Profile for Mark Gulbrandsen   Email Mark Gulbrandsen   Send New Private Message       Edit/Delete Post 
Ok I'll try again to post this pix. Bruce Willis's Liberty Theatre, Hailey, ID. Running hour reels and Kelmar Deluxe 2 projector c/o automation.
Mark @ CLACO


 |  IP: Logged

John Hawkinson
Film God

Posts: 2273
From: Cambridge, MA, USA
Registered: Feb 2002


 - posted 11-10-2002 04:30 PM      Profile for John Hawkinson   Email John Hawkinson   Send New Private Message       Edit/Delete Post 
"Component engineering TA10 will do this in it's virgin state, with a very few mods."

Err, Peter, do you mean something other than "unmodified" when you say "virgin state?"

--jhawk


 |  IP: Logged

Frank Angel
Film God

Posts: 5305
From: Brooklyn NY USA
Registered: Dec 1999


 - posted 11-11-2002 08:30 AM      Profile for Frank Angel   Author's Homepage   Email Frank Angel   Send New Private Message       Edit/Delete Post 
How about a projectionist? Install a projectionist.

 |  IP: Logged

Daryl C. W. O'Shea
Film God

Posts: 3977
From: Midland Ontario Canada (where Panavision & IMAX lenses come from)
Registered: Jun 2002


 - posted 11-11-2002 08:37 AM      Profile for Daryl C. W. O'Shea   Author's Homepage   Email Daryl C. W. O'Shea   Send New Private Message       Edit/Delete Post 
I don't know... I've known a few 'projectionists' that couldn't do a changeover if their life depended on it.

 |  IP: Logged

Brad Miller
Administrator

Posts: 17775
From: Plano, TX (36.2 miles NW of Rockwall)
Registered: May 99


 - posted 11-11-2002 08:49 AM      Profile for Brad Miller   Author's Homepage   Email Brad Miller       Edit/Delete Post 
Yeah, projectionists can be bitchy and have attitudes. Oh wait, some equipment does too.

Given enough time and effort, two of just about any automation could probably be set to run together. As far as something right out of the box that is frame accurate and loaded with options, you still can't beat the CA21. I may preach about these a lot, but they deserve the praise. Once you have worked with one, you will have a hard time using anything else, for everything else is a joke in comparison.


 |  IP: Logged

Scott Norwood
Film God

Posts: 8146
From: Boston, MA. USA (1774.21 miles northeast of Dallas)
Registered: Jun 99


 - posted 11-11-2002 09:09 AM      Profile for Scott Norwood   Author's Homepage   Email Scott Norwood   Send New Private Message       Edit/Delete Post 
As for using two single-machine automations: this would require a precise timer that would always open the changeover the incoming machine on the same frame every time. The TA-10 seems to be pretty accurate. The Xetron Maxi-10 is definitely not frame-accurate.


 |  IP: Logged

Ken McFall
Jedi Master Film Handler

Posts: 615
From: Haringey, London.
Registered: Apr 2001


 - posted 11-11-2002 11:33 AM      Profile for Ken McFall   Email Ken McFall   Send New Private Message       Edit/Delete Post 
Hi Scott...

I've no problem with using the TA10 in any way it is as you say very accurate on start to shutter open..... 'BUT' you need to remember when the 'stop' button is pressed, either using your finger or a pulse from the second automation, a number of events are triggered. ie event 3, 4 & 5. So once the outgoing projector has been 'stopped' these events will happen. So what do you do with the things on those events. If you put nothing on them then fine the change over will happen and the outgoing machine will stop and nothing else will happen. So whats the automation doing for you in the end. It's not doing your non-sync (event 4), lights (event 3 & 4), masking & tabs (event 3 & 4) etc etc. You are left with the option of controlling everything by cue's only and ignoring the event functions of the TA10.

The TA10 is an excellent automation and does what it was desgined to do VERY well. I cannot see the logic in having a system and crippling it so severly that it's no longer an automation. If you need full two projector automation with change over facility then go for a purpose designed automation. Its horses for courses.

Brad says ==============================================

As far as something right out of the box that is frame accurate and loaded with options, you still can't beat the CA21.

======================================================

I have no doubt he knows what he's on about so use the right tools for the job. Now if Component Engineering ever make a true two projector automation then I would have no hesitation recommending it based on my experience of the TA10. Until then.... I'd look else where.


 |  IP: Logged

Steve Kraus
Film God

Posts: 4094
From: Chicago, IL, USA
Registered: May 2000


 - posted 11-11-2002 11:35 AM      Profile for Steve Kraus     Send New Private Message       Edit/Delete Post 
I think you should be able to wire them so that one (presumably on the outgoing machine) performs the actual changeover. Each automation opens its own C/O and closes the other. I don't recall the details but it's something like that.

I agree about the TA-10. It's pretty much frame accurate in my tests. I have one here on one machine (put in years ago as a training aid) and I sometimes use it if I want a nice long preroll and open exactly on the right frame. Maybe I should get a second one and have C/O's that precisely show first and last frames--great for badly edited movies.

A side benefit would be forgetting to remove cues would mean for once a C/O house would muck it up for a platter house!

 |  IP: Logged

Brad Miller
Administrator

Posts: 17775
From: Plano, TX (36.2 miles NW of Rockwall)
Registered: May 99


 - posted 11-11-2002 03:32 PM      Profile for Brad Miller   Author's Homepage   Email Brad Miller       Edit/Delete Post 
You don't have to put cues on the film to use the CA-21. It can be ran manually as well with less effort than a typical manual booth.

 |  IP: Logged

Pat Moore
Master Film Handler

Posts: 363

Registered: Mar 2000


 - posted 11-12-2002 08:32 AM      Profile for Pat Moore   Email Pat Moore   Send New Private Message       Edit/Delete Post 
We looked into an add-on module for the CineNet Automations to allow two-projector changeover operation, but just never found the market for it. The concept was easy, just could never find the need for it. Is the need really out there?

Pat

 |  IP: Logged

Ken McFall
Jedi Master Film Handler

Posts: 615
From: Haringey, London.
Registered: Apr 2001


 - posted 11-12-2002 01:33 PM      Profile for Ken McFall   Email Ken McFall   Send New Private Message       Edit/Delete Post 
I've given some thought as to how you would get a two projector TA10 to perform as a Change over automation WITHOUT crippling it in any way.

Setup your two projectors using the CE second relay box, so you have selection of any one projector. All this relay box does is duplicate the relays at the bottom of the TA10. The selection switch just determins which set of relays is currently controlled. Wire the projector selection switch thru a relay that can be latched as required. N/C would be projector 1 or your main projector, N/O the other prjector.

You then set up a cam timer to react to a cue from the TA10. As the cam rotates it would do the following.

1 Cam motor is latched on by one set of contacts on the cam.

2 Short the projector selector switch so that both projectors are selected. This will put the incoming machine into the same running state as the outgoing machine.

3 At the required time the incoming projectors C/O shutter should be pulsed to Open and the outgoing to Closed. Sound should follow the projector anyway, assuming its been wired within the projector. If not projector sound should also be pulsed/selected.

4 Immediatly after the actual change over the projector selector relay should be latched so it is pointing to the second projector.

5 The timer should now break the short on the projector selection relay so that the initial projector, which is no longer 'Selected', stops. The second projector is now the 'Selected' projector as far as the TA10 is concerned and has full automation available to it and remains running.

6 The timer should then return to its inital start position and unlatch the motor, ready for the next changeover.
=====================================================

There would need to be a couple more relays to determin which projector is running so that the proper shutters are opened or closed and to latch or unlatch the projector selection relay. But this is a simple matter.

The alarm system presents no problem as the TA10 requires a Closed contact when film is running for motion and presence. So the fact that one pair will be 'Open' when a projector is idle does not matter. This is exactly how things are with a normal two projector setup anyway.

This method is considerably cheaper than buying two TA10's and requires very little work to make. Its big advantage is that NONE of the TA10 is crippled. All events can be fully utilised.

Hope someone finds this interesting.



 |  IP: Logged

Steve Guttag
We forgot the crackers Gromit!!!

Posts: 12814
From: Annapolis, MD
Registered: Dec 1999


 - posted 11-12-2002 03:46 PM      Profile for Steve Guttag   Email Steve Guttag   Send New Private Message       Edit/Delete Post 
Pat:

The market is there...I just don't know how big it is. The bulk of our installations are 2-projector but the bulk also have operators and are single screens...screening room types that don't lend to automating. Really, the 2-projector automation would be for a multiplex.

Steve

------------------
"Old projectionists never die, they just changeover!"

 |  IP: Logged

Pat Moore
Master Film Handler

Posts: 363

Registered: Mar 2000


 - posted 11-12-2002 06:48 PM      Profile for Pat Moore   Email Pat Moore   Send New Private Message       Edit/Delete Post 
Hi Steve; I agree the market is there, it's a question of size of course. There's so much going on it's hard to commit resources to something that may not have a whole lot of market. It's stuff you and I have talked over before and the interest remains lukewarm.

There are locations overseas that look for combination single and dual projector capacity. However, they tend to do single projection from the platter automated, and run reel-to-reel manually.

Pat


 |  IP: Logged

Steve Guttag
We forgot the crackers Gromit!!!

Posts: 12814
From: Annapolis, MD
Registered: Dec 1999


 - posted 11-12-2002 08:01 PM      Profile for Steve Guttag   Email Steve Guttag   Send New Private Message       Edit/Delete Post 
A market I'm seeing emerge a bit is the art house that will have 2-projectors and a platter (on at least one screen)...those types are interested in a 2-projector automation.

There are a couple of players now in the capable field...Pennywise, Kelmar and Panalogic. Note, two of them originate overseas!

Steve

------------------
"Old projectionists never die, they just changeover!"

 |  IP: Logged



All times are Central (GMT -6:00)
This topic comprises 3 pages: 1  2  3 
 
   Close Topic    Move Topic    Delete Topic    next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:



Powered by Infopop Corporation
UBB.classicTM 6.3.1.2

The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion and agrees to release the authors from any and all liability.

© 1999-2020 Film-Tech Cinema Systems, LLC. All rights reserved.