|
|
This topic comprises 3 pages: 1 2 3
|
|
Author
|
Topic: Adding trailers to platter (photo)
|
|
|
|
|
Brian Michael Weidemann
Expert cat molester

Posts: 944
From: Costa Mesa, CA United States
Registered: Feb 2004
|
posted 12-19-2005 09:19 PM
I used to do this all the time, when I had control of programming, swapping out, and adding trailers. As long as I kept an eye on it and, yes, had at least PART of the roll down and level with the rest of the feature, it works great.
The reason I personally wouldn't have just spliced the feature to the trailer roll would be I'd have to wait a whole show before screening the trailers. At the second-run 8-plex I started at, I don't think we had the luxury of time. I'd rather screen them NOW, while I have time, than in two hours, when I may be swamped and not available to sit around for 10-15 minutes double-checking something I could have already done. (Plus, they were almost ALWAYS for new trailers we just received, and everyone wanted to watch them immediately. We still programmed first-run trailers.)
Most of the time, though, I didn't have to add a whole 4-5 trailer pack to a feature; I added one or two at the most, or I was removing one or two and adding something their place ... which, if you do it right, you don't even need to rest anything on TOP of the rest of the print.
Ah, I remember the days of trailer swapping (flawlessly, every time) in 5 minute turnarounds. It's THAT kind of stuff that makes the craft of booth operations fun!
Now, it's just too bad that you can't add trailers to IMAX prints with a QTRU feed head in that fashion! It would sure save a load of time.
| IP: Logged
|
|
|
|
|
|
|
|
Brian Michael Weidemann
Expert cat molester

Posts: 944
From: Costa Mesa, CA United States
Registered: Feb 2004
|
posted 12-19-2005 10:18 PM
Yes, of course I had to stay to watch the film run through. I always screened them from the booth, anyway.
Extra 15 minutes? Not really. Fellow employees would just say, "Hey, these came in, can you add them to something starting in the next 20 minutes?"
If I built trailers and added them with, say, a bad splice, I'd catch it when I started that first run, while watching to make sure it feeds properly. If I ran the movie through bypassing those trailers on the first pass, I'd go to start its subsequent run and not think twice about leaving once on screen, to start threading another auditorium or something. Eight auditoriums, every one of them doubled up, you've got a lot of prints to keep track of (and this was early in my "career") so I wouldn't have put it past myself to have an oversight.
Either I'm just not a patient person, or I just like completing the task I start because I don't trust I'll finish if I put off the last steps.
I don't know. There's no real LOGIC here. You just do what you have to do, with whatever circumstances, to get something on screen.
| IP: Logged
|
|
Richard Hamilton
Phenomenal Film Handler

Posts: 1341
From: Evansville, Indiana
Registered: Jan 2000
|
posted 12-19-2005 10:38 PM
not to be a smartass, but I still don't comprehend! A "fellow employee" can hand you some previews, ask you to run them on a print that starts in 20 minutes, and this is better? This means you make them up on a ring with attached leader, then take them off the ring, lay them on top of the feature, splice them, thread them, start them, and then watch them?
| IP: Logged
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
All times are Central (GMT -6:00)
|
This topic comprises 3 pages: 1 2 3
|
Powered by Infopop Corporation
UBB.classicTM
6.3.1.2
The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion
and agrees to release the authors from any and all liability.
|