70mm film handling done (sorta) wrong!

Collapse
X
 
  • Time
  • Show
Clear All
new posts

  • Brad Miller
    replied
    It's not as critical for post-production where you're working with a work print as that's just temporary during the production process. For a cinema that needs to take care of a print so it can be run hundreds or thousands of times though, yes basically stop short using long leaders and ensuring every projectionist is threading as far ahead of the countdown as possible. Once threaded, turned over and sure it all looks good, run the projector motor. During that rundown utilize the time to double check the threading, takeup clutch is properly engaged, the film is properly seated on every platter roller, loops are not slapping against anything, etc while running at full speed. When the countdown starts getting close, turn the motor off and use the POS or JOG on the projector so it runs slowly (6FPS is a good speed) and if needed, advance the last 2-3 frames by hand. For theaters without any sort of POS or JOG control, it's easy enough to figure out about where to flip the projector motor off at by watching the film pulling off of the feed reel and have it coast to a stop about a foot before "the" frame your system needs to target to inch it the last few frames.

    Same basic principle for platters, except many people prefer to start the projector halfway through all of that rundown protection leader and perform a "running start" instead of an 8 second timed start. That is particularly helpful when running platter models that have issues at startup getting up to initial speed and wrap around the brain a bit.

    Regardless every cinema presentation I've ever been impressed weeks and months into the run on a print was following those practices. Some of them I know picked it up from me, others had learned it elsewhere and I'm sure many figured it out on their own. It's all a matter of being willing to put forth the extra effort and understanding how dirt migration works and how dirt is what eventually turns into cinch scratching at minimum.

    And a little known fact, some prints may leave your theater with perhaps only the slightest perception of cinch "rain" at the reel changes...but during return shipping after FedEx kicks it around a lot, if your wind isn't perfectly tensioned from beginning to end (which doesn't happen on a standard clutch-based rewind table), ANY dirt on your print becomes cinch scratches from film slipping against itself.

    Leave a comment:


  • Adam Liberman
    replied
    Originally posted by Brad Miller

    (You know the type. They're those "I was taught to put da 8 in da gate by mah great granddaddy" people. The same ones that simply cannot grasp the concept that better ways to handle film have been learned over over the years and they are hung up on grossly outdated practices which are not in the best interest of the long-term health and presentation quality of the print just because "that's how I was taught".
    Hi Brad, Could you please clarify what the recommended procedure would be then for changeover to put the desired start frame in the gate? Stop short and then inch the projector? And for platters? (lots of film experience but 35mm projection only in sound post-production, where we had work-print and did thread the start mark in the gate to sync up with the mag dubbers).

    Leave a comment:


  • Tony Bandiera Jr
    replied
    Originally posted by Mark DeCew
    Holy Cow. I'm new to the forum and currently on Day 46 of my odyssey projecting "The Odyssey" in 5/70. I watched Andrew's video early on in a large film format internet rabbit hole and, as a filmmaker, found it decidedly more watchable than similar "see me thread the projector" YouTube offerings. After reading every comment on this thread, I am now reluctant to post anything about my experiences in the booth.
    Don't be.The reason you saw what you saw in the comments was because of the unfortunate attitude stance that was taken by a certain someone. We are all here to learn, and critique, and hopefully become better at our jobs. Sometimes that criticism may seem harsh, but no personal malice is intended. This is a forum of professionals who ideally strive to always do the best job possible, which is to provide flawless presentations to the public while at the same time taking extraordinary care of the media we present. Unfortunately that didn't happen in this particular case, and we called the individual out on it. That person chose to respond with arrogance and hostility rather than humility, which is most unfortunate. Perhaps, as Steve pointed out, that person was more focused on making cool videos for social media.

    I have had my share of damaged prints, thrown prints, buildup and teardown mistakes, starting the wrong shows, showing the wrong trailers to a kid's audience (never trust the ratings bands), etc. I also told of what I consider to be my biggest mistake, the improper mounting of an Ultra Panatar anamorphic attachment which put the image on the side wall of a full auditorium of over 500 people. I have also shared, both privately and publicly some of my worst days in the booth. I had some harsh truths sent my way, but instead of puffing up about it on a forum or social media, I took my lumps and learned from my mistakes.

    People who know how to handle film properly are dying off (literally) and the availability of film prints is going to get worse. It is vital that we preserve those prints, and more importantly, teach the new guys (some of whom have generational issues with lack of respect and ability to learn). Otherwise, this industry will end sooner rather than later.

    Leave a comment:


  • Mark DeCew
    replied
    Holy Cow. I'm new to the forum and currently on Day 46 of my odyssey projecting "The Odyssey" in 5/70. I watched Andrew's video early on in a large film format internet rabbit hole and, as a filmmaker, found it decidedly more watchable than similar "see me thread the projector" YouTube offerings. After reading every comment on this thread, I am now reluctant to post anything about my experiences in the booth.

    Leave a comment:


  • Steve Guttag
    replied
    One thing that strikes me, the more I think about it...Andrew, a 30-year veteran of the craft (or so I have read), though carries a magnetically held light in his arsenal, as well as tripod(s)...but when dealing with Century projectors, does not appear to carry a set of allen keys or a couple of straight blade screwdrivers. Those two types of tools pretty much allows an experienced person to tear down a Century and repair it (it's about as simple a machine as it gets). If the problem was a loose intermittent flywheel, a simple allen key would have been able to snug that up, particularly if he was talking with a technician to guide him.

    i get it...he was paid to thread up film, not fix projectors...but again, a 30-year vet? No tools? But has all of the video stuff? It tends to indicate where the priority was. I also don't get why someone with 30-years showing film wouldn't, instinctively, not take the safer and easier method in favor over a significantly riskier and more heavy-handed choice. Something just doesn't add up.

    The other thing that Andrew doesn't probably get/understand...that print will go back to F-T, like it or not. If his claim of "Zero damage" (except for the splice) doesn't hold, I suspect we'll get to see/hear about that (or maybe not).

    Brad and I do not agree on everything and every technique but we do share a mutual respect of trying to put out the best presentation and with the least amount of film damage as possible and, as a result, tend to agree on a lot more than we disagree.

    You're totally right...I am incapable of acknowledging that I did anything wrong...because I didn't do anything wrong.
    That line right there. That is the one that rubs (and probably literally). Setting aside whatever rules/procedures that may have accompanied the print, that statement displays an arrogance because aside from right/wrong, it does not acknowledge that, just perhaps, the choices you made were not best ones and that in future situations, you would not learn from this incident. This belies the 30-year statement as it may have been the same year repeated 30-times (I've seen that a bunch) rather than gaining 30-years of accumulated knowledge. I think you do care about the film and in the audience experience. However, as an operator, your choices and responses have perplexed me a bit, unless the motives of the primary job, in this situation, (projectionist) and the side-hustle (videographer/vlogger) are transposed.

    Leave a comment:


  • Phil Ranucci
    replied
    I watched the video and had the same reaction as most. One thing that did occur to me is that in many older booths there were conduits(flex) running from the pedestal and/or soundhead to the front wall.
    It's possible that the film couldn't be unthreaded and run back to the platter.

    Leave a comment:


  • David Kornfeld
    replied
    Good gravy, what a thread. Theres a lot here that I very much disagree with, & almost as much that I think has it right; but I'm not going to engage in any bomb-throwing, because thats ultimately always counter-productive & I'm just not interested in going down some technical rabbit-hole & arguing a point that someone "knows" is right. As Mr Miller slyly hinted, we all have more than enough of that to go around.

    What I will say is that anyone who has been in this craft for any substantial length of time -- & god knows, I can sadly say that about myself -- is eventually going to make a mistake of one kind or another: thats the admission price for being human. We're error-prone. We cant escape it.

    However, when I'm training someone, I always tell him/her that mistakes in this craft fall into two basic categories: the mistakes that dont matter, & the mistakes that do.

    The mistakes that dont matter are the occasional presentation errors: reels out of order, blown changeover, wrong sound format, miss the curtain cue, out of frame for some reason or other, threading tails out, threading with the soundtrack facing in, forgetting to open the douser or turn on the lamp, changing over from a reel of title A to a reel of title B, running the numbers on the screen, letting a reel tail out in front of everyone, stuff like this -- all these are embarrassing, to be sure (and some more mortifying than others) -- but, in the scheme of things, theyre inevitable & dont make much of a difference in the long run.

    The mistakes that DO matter are the film-handling errors. Those make a very big difference. Emulsion scratches, base scratches, cinch scratches, hack scratches, sprocket damage, sprocket run-off, pulled sprockets, pointed sprockets, crushes, mangled footage, oil mottling, dirt build-up, scorching, frame burns, & so on & so forth -- the introduction of these or any others kinds of damage are the lasting, unfixable kind.

    Youve blown a changeover? Big deal. Get back on screen & suck it up. Thats just one screw-up on just one reel on just one show. You run bright green & yellow lines down an entire print? That means that every future show of that movie is permanently crappy, & every future audience gets to witness the result of your mistake.

    Which of the two would you rather make? I know which side my money is on.

    As Mr Guttag mentioned above, "Everyone's a critic," which is true enough. I would point out, though, that well-intentioned criticism is a sometimes needed & necessary thing, as no one can possibly know everything there is to know about this craft, & closing your mind to people with more knowledge & experience & expertise in this strange & dying profession is not exactly what I would call the road to enlightenment.

    Just my two cents' worth.

    Leave a comment:


  • Marcel Birgelen
    replied
    Well, in hindsight, I should've called the owner (which was very hands-off, as the place, back then was a pretty good cash cow and we apparently ran it "well enough" not to bother us too much) and made clear that this was an unworkable situation, especially given the amount of people we already expected that night. We were always short on personnel, but for me that was more a challenge than anything else and if you planned everything well in advance and made use of the basic automation you had, you could easily run that place with four or five people, even on the busiest nights. But in this case, the best solution would probably have been to prematurely cancel one or two shows. But I still was young and eager back then and in hindsight, this was a great way to learn not to overestimate your capabilities. I mean, nobody got hurt that night, and it's often the unexpected things in life that are the ones most worth remembering.

    Leave a comment:


  • Ryan Gallagher
    replied
    Originally posted by Marcel Birgelen

    TAIL to HEAD... and I let it run, because when it happened, I was close to a mental breakdown... let me try to reconstruct what happened before from memory...

    First of all, it wasn't me who threaded the projector either... but a junior colleague, but it was, eventually my responsibility, as the "elderling"... I didn't have the situation under control, but in hindsight, I think, I was thrown an impossible to solve case.

    Let's take the Delorean back to 1997... almost 30 years ago, like holy shit, I'm getting old.
    The movie where it happened was Con Air... We had 4 screens, in an old building (still standing and showing movies today b.t.w.). Three projection booths and a defective platter system in the biggest room... The platter went off-line the other night, almost causing a shitshow itself, so when we took the movie off of the platter and spun it onto reels, there was barely time to put on leaders and labeling... numbering the reels is essentially all we did, due to complete lack of time... Being the oldest room in the house, it luckily had two projectors: Two Vic5s. I gave a crash-course in running change-overs to my junior and we went with it for the next shows, hoping the service tech would show up soon to fix the broken platter.

    That night, we were with a total team of four, officially, but one called in sick and the other one just didn't show up... so, there we were, two "projectionists" now on "full duty": We didn't just have to run the movies, of which one room in change-over, we also had to attend to all the other stuff, including selling tickets, ushering in guests, but ALSO guest service, as this was, even back then, a cinema with seat service... So, I found myself in the kitchen frying "bitterballen" (a very Dutch thing, look it up...) one moment, just to be in time in booth #1, for changeover. The previous change-over was handled by my colleague, because I remember being in Room #2, where the DTS failed to kick in... we ran analog that night I remember...

    So, there I was back in Room #1, just in time for the motor cue, as my colleague was attending kitchen service... The first sign of something wrong was the DA20 erroring out... what was the reason for that became apparent soon...
    Good times (not). That many hats situation sounds like the primary culprit. Ticketing, House Manager, Concessions (including kitchen type duties), and finally Projectionist for a lesser known and more hands-on process implemented as the stop gap solution to the failed hands-off one. It's a miracle you even got to the backwards reel at all!!

    Leave a comment:


  • Marcel Birgelen
    replied
    Originally posted by Ryan Gallagher

    Wait a minute... by "unreversed" do you mean it TAIL to HEAD? How does one get through an entire reel without catching the backwards audio? Not throwing shade, just very curious how that actually happens. Our booth is pretty leaky acoustically... even without program feed turned up I'd still probably catch a reversed soundtrack. Plus there is all those people walking backwards? hehe.

    I can see how this condition gets set up on accident... a rewinding skip/mishap, poor labels, heads/tails swapped by some previous platter house, distracted inspection of an otherwise good condition print... it's the running that reel more than 5min part I am most curious about! LOL

    Good one, thanks for sharing!
    TAIL to HEAD... and I let it run, because when it happened, I was close to a mental breakdown... let me try to reconstruct what happened before from memory...

    First of all, it wasn't me who threaded the projector either... but a junior colleague, but it was, eventually my responsibility, as the "elderling"... I didn't have the situation under control, but in hindsight, I think, I was thrown an impossible to solve case.

    Let's take the Delorean back to 1997... almost 30 years ago, like holy shit, I'm getting old.
    The movie where it happened was Con Air... We had 4 screens, in an old building (still standing and showing movies today b.t.w.). Three projection booths and a defective platter system in the biggest room... The platter went off-line the other night, almost causing a shitshow itself, so when we took the movie off of the platter and spun it onto reels, there was barely time to put on leaders and labeling... numbering the reels is essentially all we did, due to complete lack of time... Being the oldest room in the house, it luckily had two projectors: Two Vic5s. I gave a crash-course in running change-overs to my junior and we went with it for the next shows, hoping the service tech would show up soon to fix the broken platter.

    That night, we were with a total team of four, officially, but one called in sick and the other one just didn't show up... so, there we were, two "projectionists" now on "full duty": We didn't just have to run the movies, of which one room in change-over, we also had to attend to all the other stuff, including selling tickets, ushering in guests, but ALSO guest service, as this was, even back then, a cinema with seat service... So, I found myself in the kitchen frying "bitterballen" (a very Dutch thing, look it up...) one moment, just to be in time in booth #1, for changeover. The previous change-over was handled by my colleague, because I remember being in Room #2, where the DTS failed to kick in... we ran analog that night I remember...

    So, there I was back in Room #1, just in time for the motor cue, as my colleague was attending kitchen service... The first sign of something wrong was the DA20 erroring out... what was the reason for that became apparent soon...
    Last edited by Marcel Birgelen; 08-04-2026, 10:26 AM.

    Leave a comment:


  • Ryan Gallagher
    replied
    I'll throw another one in the mix (and beg forgiveness of my co-projectionist later). Not as audience facing. But like I said we had minimal experience with cans and cores, in fact it was probably the same print where this happened?

    I had coached my co-projectionist a little (but apparently not enough) about how to safely do the transfers in and out of can with the split reel halfs etc, carrying film on cores, if you have to without a reel, vertically etc. I left to go to the bathroom or pop downstairs for a minute.

    When I came back up he looked entirely perplexed and was staring at a reel on a core on the workbench where the center 1/3 of the reel had lifted out of the wrap on him. He recognized you could not just "put it back" at this stage... but was at a loss as to how to safely proceed.

    If there are better methods than this let me know, but I showed him the method shown in that Japanese film handling video shared not too long ago... loosen and outer wind and re-tape it, then work everything before the fault gently to that larger wind size, reseat the displaced core, then reverse the process to shrink the outer wind back down... all on a flat clean bench, ideally while wearing gloves.

    Learned pretty quickly that one mis-supported lift of film on a core with unknown wind tension integrity can set you back an hour! And I had to deploy untapped knowledge I only had prior access to because of this forum.

    Only other method that comes to mind would be a full size trash can with clean liner... and rotate off and "flake" the film before the fault into it... then put the displaced core (now without outer winds) on a reel and manually tension the film as you wind it back to it out of the bin. Do a full rewind cycle gently increasing tension... cause your first manual one was likely shit. (Equally shit with the flat bench enlarge and shrink method).
    Last edited by Ryan Gallagher; 08-04-2026, 09:48 AM.

    Leave a comment:


  • Ryan Gallagher
    replied
    Originally posted by Marcel Birgelen
    You can check your splices all you want, with or without gloves...

    As for my biggest fuckup... I haven't ranked them yet. I guess running an entire unreversed reel in a close to sold-out changeover show came close, although I wasn't the one on rewind duty, so technically not entirely MY fuckup.
    Wait a minute... by "unreversed" do you mean it TAIL to HEAD? How does one get through an entire reel without catching the backwards audio? Not throwing shade, just very curious how that actually happens. Our booth is pretty leaky acoustically... even without program feed turned up I'd still probably catch a reversed soundtrack. Plus there is all those people walking backwards? hehe.

    I can see how this condition gets set up on accident... a rewinding skip/mishap, poor labels, heads/tails swapped by some previous platter house, distracted inspection of an otherwise good condition print... it's the running that reel more than 5min part I am most curious about! LOL

    Good one, thanks for sharing!

    Leave a comment:


  • Marcel Birgelen
    replied
    You can check your splices all you want, with or without gloves...

    The problem Steve was mentioning are the lab splices and I've heard from a number of people running film now that they are becoming increasingly problematic, as in weak. Most of those lab splices will be of the ultrasonic kind, you'd expect those to outlast any tape-based splices. Problem is, when you're going to re-splice them, you'll be losing frames.

    Originally posted by Brad Miller
    World events over the last 18 months alone should be more than enough proof that this world doesn't need any more of that exact kind of behavior. Think about it.
    I see some politics leaking through here, but I can fully understand where that's coming from.

    As for my biggest fuckup... I haven't ranked them yet. I guess running an entire unreversed reel in a close to sold-out changeover show came close, although I wasn't the one on rewind duty, so technically not entirely MY fuckup.

    Leave a comment:


  • Tony Bandiera Jr
    replied
    Originally posted by Steve Guttag
    I've had too many splices fail (both ultrasonic and cement) where one corner is starting to give. Twice in as many years, I've seen the results of a break where none should have been too. Was it a factory splice? Dunno but I would have known for sure if the spices were checked.
    I check my spices for freshness every year and toss any that have gone stale. As for my SPLICES, any that started to make too much jump or noise were remade as needed.

    Attention to details, Steve-O. You are usually better than this.

    Oh, and gloves aren't one of my fetishes. Be careful what you wish for before I tell you what mine are!

    Leave a comment:


  • Tony Bandiera Jr
    replied
    This latest video was brought to my attention by another F-T member. I watched it and decided to hold back on commenting as I knew you guys would end up saying what I was about to say, (especially Brad.)

    Andrew, saying you have 30 years experience (is that full time BTW?, as with all of the travel and other videos you do I doubt you worked a booth for most of that 30 years) is nothing to brag about on here as most of the ones you are disagreeing with have more like 40-50 years of full time experience both as projectionists and technicians. I have learned a LOT from most everyone on here, had some of my own bad habits corrected and I have shared some of my greatest fuckups as well. I don't get defensive about it, I LISTEN AND LEARN. It has saved my bacon more times than I can count.

    That same edict applied to my later full time career as an electrician. I learned a lot from the "old hands" and never argued or dismissed their advice with an attitude of "I know better than you do." Again, over the years it has saved me from some very dangerous situations and causing very expensive damage. (Some of the industrial switchgear I had to work on cost well into high six figures.)

    and this:
    Because of your attitude I will only being dealing with BLS on any issue...not you.
    Is absolutely the wrong attitude to take with someone who has strong ties with all the major studios and BLS. It would not surprise me to see you removed from their callout lists, so you may be running your last ever 70mm show. Like Brad said, there is a protocol in place for dealing with issues which you not only ignored this time, but NOW you publicly admit you'll refuse to follow it in the future. My years in the projectionist union saw projectionists getting removed for that kind of attitude and sometimes even less.

    I'm gonna end this post with a blast from the past on the old forum software, where I shared my worst ever fuckup (that thankfully did not result in my causing film damage, even though the manager did):

    Originally posted by me, a long time ago 1982 to be exact
    [SIZE=2][FONT=Verdana, Arial]I think my worst mistake ever came during my first year as a projectionist in Tucson at the Air Force Base theatre. We had Simplex XL's with RCA 9030's, 2,000' magazines..and the old Ultra-Panatar "mirror box" 'scope attachments. Feature was "Conan The Barbarian", with a flat trailer/policy reel on the number one machine.

    Did my changeover to the feature, BAM! Picture on SIDE WALL of the auditorium!! One "Holy F--in S--t!" heard by everyone in the house,shutdown, manager racing up the stairs ripping the still-turning reel off the machine (he thought I had the film in backwards). Manager winding film like a madman, me pissed and puzzled by why pic's nowhere near the sheet ...finally found I hadn't seated the Ultra Panatar on the top crossbar right. Started the machine, shifted the attachment as the house saw the rectangle of light magically move to the screen. Luckily for me the two-star General movie buff wasn't there that night.!

    Same theatre, opened the Peerless Lamphouse with the xenon conversion operating. Still have the burn in my left eye.

    Again, same theatre..ran preview (green band) for a movie about a woman's talking privates to a kiddy matinee ..official policy was quickly changed to pre-screen ALL trailers before public showing! [/FONT][/SIZE]​
    Here's the link to the whole thread: https://www.film-tech.com/cgi-bin/ub...c;f=1;t=000997

    Leave a comment:

Working...