My instinct is we need to do "more" to protect our enigma board longevity if we want to avoid premature capitol replacement to an IMS.
Would you agree with the following:
Our CP2220 in the smaller venue was not configured with a 110v standby circuit doing anything, nothing plugged into the IEC receptacle. As we moved our Doremi to this room after the GDC suffered a non-recoverable battery failure, and the enigma board from the outgoing projector along with it. At the time of the move I noticed the date code on the Enigma battery was 10+ years old. I understand these are not field replaceable rechargeable batteries, and a battery failure there is certificate loss, and Enigma boards with good batteries are hard to come by.
For best preservation of this battery my assumption is we should avoid at all costs protracted power/standby loss events of the CP2220.
We have some unused UPS units around, but would need a cell or module swap to become usable again (minimal expenditure if doing cells). Is putting one of them in the projector location and providing it's standby power via 1000VA UPS a reasonable "preventative" measure that is proactive on this problem?
I've read in the forums over time that best advice is just to never power down the unit, keep that trickle charge active. And as it gets even older, it may be best not to even put it in standby anymore, cause even the trickle charge can't fix a fully failing battery.
A new UPS or OEM battery module is likely outside our restricted budget modes right now.
This came up because an AC unit replacement required killing the building power for about 6 hours the other day, and I was not notified until day of (my day off). We survived that one, but I don't like our odds to keep doing it.
Would you agree with the following:
Our CP2220 in the smaller venue was not configured with a 110v standby circuit doing anything, nothing plugged into the IEC receptacle. As we moved our Doremi to this room after the GDC suffered a non-recoverable battery failure, and the enigma board from the outgoing projector along with it. At the time of the move I noticed the date code on the Enigma battery was 10+ years old. I understand these are not field replaceable rechargeable batteries, and a battery failure there is certificate loss, and Enigma boards with good batteries are hard to come by.
For best preservation of this battery my assumption is we should avoid at all costs protracted power/standby loss events of the CP2220.
We have some unused UPS units around, but would need a cell or module swap to become usable again (minimal expenditure if doing cells). Is putting one of them in the projector location and providing it's standby power via 1000VA UPS a reasonable "preventative" measure that is proactive on this problem?
I've read in the forums over time that best advice is just to never power down the unit, keep that trickle charge active. And as it gets even older, it may be best not to even put it in standby anymore, cause even the trickle charge can't fix a fully failing battery.
A new UPS or OEM battery module is likely outside our restricted budget modes right now.
This came up because an AC unit replacement required killing the building power for about 6 hours the other day, and I was not notified until day of (my day off). We survived that one, but I don't like our odds to keep doing it.
Comment