|
|
This topic comprises 4 pages: 1 2 3 4
|
|
Author
|
Topic: The "perfect" threading procedure
|
|
|
Chad M Calpito
Master Film Handler
Posts: 435
From: San Diego, CA
Registered: Apr 2006
|
posted 04-23-2006 03:00 AM
Thanks for the input and pics, Monte. I, too, use the Simplex 35 models. Personally, I like the Simplex 35 projectors. Anyway, I thread them just like you do, except for maybe a minor variation, but, my threading is the same.
I've also tried the Christie Projectors, but, could not stand them. Well, I better not get off topic. Anyway, thanks for the pics and tips, Monte. I learn something new everyday.
| IP: Logged
|
|
|
|
Nathan Fettes
Film Handler
Posts: 11
From: kalamazoo, MI, USA
Registered: Jan 2006
|
posted 04-23-2006 09:33 PM
It is kind of sweet that this comes up the same time my theater is trying to convert all of us to the thread down up procedure. We have all strong equipment and the old people thread gate first then around that. The new people thread bottom up as required by our “policy.” Then we get an email that we all have to thread bottom up. All of us that thread gate first do the same thing. First, we thread entire platter (all Strong equipment.) Then we pull film so the tension mechanism on the platter keeps tension. Then we thread the gate first.. Before threading, the intermittent is turned so it has just advanced and the same length of loops will always be consistent. This will insure the leader never touches the ground due to the platter tension. Is this wrong to thread middle out? I have been condemned from my corporate office because they made the “my way or the highway” point of view. We train our entire new projectionist staff the bottom up (strong system) threading. The fact is, our chain has many different projectors and they use the bottom up technique as the only way regardless of the projectors. If we get caught doing other, I can get written up. I have always threaded gate first and now I can get fired for this only because it is the “policy.” The gate first technique I use never lets the leader touch the ground and it is faster for me but I can not get it unless I try to grandfather clause it in. Should I just learn a new technique that will double or triple my threading time or is this just as good as the way they recommend, bottom up. We have all strong equipment, platters and projector heads. The way I thread is as follows: 1. Thread entire platter, ignoring projector, besides top and bottom rollers 2. Turn the motor so the intermittent just turns 3. Pull the film so the film has tension from the platter 4. Thread the gate, then the top loop and DTS unit. 5. I put my finger to the base of the projector for the bottom loop and when I close the pad, it moves so the film is not hitting the wall or putting tension on the pad. 6. Then I thread the five star sound head and failsafe. Just interested if this is acceptable. This will insure the frame distance of the sound head where as other techniques can very by a frame or so. Just wondering, Nathan
| IP: Logged
|
|
|
|
|
|
|
|
|
|
|
|
Chad M Calpito
Master Film Handler
Posts: 435
From: San Diego, CA
Registered: Apr 2006
|
posted 04-24-2006 11:03 AM
When I worked at an 18-plex theatre with two different booths on two levels, there were times I had to thread and start all 18 projectors by myself, literally. Accuracy was (and, of course, still is important, though I had to work quickly. Going between the two booths via an elevator is no easy task when I have movies that start at the same time between both of the booths.
In essence, I think it is better to be accuracte. But, I will say this, I used to do threading races before as well, but, I don't prefer to do it anymore.
| IP: Logged
|
|
|
|
|
|
|
|
|
|
Eric Robinson
Jedi Master Film Handler

Posts: 538
From: Santa Rosa, CA
Registered: Jan 2005
|
posted 04-26-2006 12:26 AM
quote: Louis Bornwasser (Remember the leader....header....never goes through a projector; in fact we once used non sprocketed film for that purpose.)
I thought I knew what I was doing until I read the above quote.
Our standard method of practice is to provide enough leader which can run through the projector during startup so that the automation is capable of triggering the electronic changeover. At that point in time, we look at the film running through the projector (house and stage lights are at half down), as soon as we see Green Band at the aperture, we open the manual dowser. We then continue, (not thread related), to watch as patrons come into the theatre. If its a low traffic film, we hit lights down after no more patrons are entering. If its high traffic, we wait until the THX trailer, at the latest, to hit light down. We keep this step purposefully manual to keep the projectionists attentive.
Anyway, now that I'm completey off track...it sounds as if we are not supposed to have any leader running through the machine. If this were true; however, this would imply that the beginning of the green band for the first trailer would have its head located at the basement sound head lower feed sprocket??? Gotta throw in the puke icon
| IP: Logged
|
|
|
|
All times are Central (GMT -6:00)
|
This topic comprises 4 pages: 1 2 3 4
|
Powered by Infopop Corporation
UBB.classicTM
6.3.1.2
The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion
and agrees to release the authors from any and all liability.
|