|
|
This topic comprises 6 pages: 1 2 3 4 5 6
|
|
Author
|
Topic: Superman Returns
|
|
|
|
|
Brian Michael Weidemann
Expert cat molester

Posts: 944
From: Costa Mesa, CA United States
Registered: Feb 2004
|
posted 05-22-2006 08:58 PM
I'm not sure what you mean by lanyards. I haven't heard anything about that. But we are changing glasses from the ones we've been issuing for the past several 3D films. Instead of the disposable paper crappies, we're using multicolored plastic frame (in yellow, black, and red!), 45 degree polarized glasses starting with Superman.
Although I think a mechanical polarizer lifter would be cool, lined into the air system and triggered with a DTAC event, that hardly seems like a necessary upgrade. I mean, HOW MANY MOVIES are we going to be playing that will require a SWITCH from 2D to 3D and back mid-show?
For our GT system, where operators have access to the hood and front area of the projector while running (as opposed to, say, IMAX Dome theatres where the projector is transported to inaccessable Show Positions), it seems a simple, non-mechanical, sliding mount would be sufficient, manually operated at a point in the movie. We operate the lighting cues manually, in synch with the presentation. I would think a manual switch at, say, 02:16:54.23 would be easy enough. As operators, we're present with the projector at all times, right? Put us to work!
If this film is as long as Harry Potter & The GOF (which it really can't be longer than!), then that's 46 reels times two. And, by my calculations, 92 reels will take me (at my most time-efficient rate) between 18-20 hours assembly time alone. That's three overnight shifts, a fourth one to screen it, most likely. Poseidon's original delivery schedule from DKP was the DAY before our first public screenings (and luckily, we actually received the print two days before then!). I'd love to get the print a week before opening (which will undoubtedly be something like a 9:00pm and midnight show, that Thursday), but we'll see when DKP has 'em ready to go.
| IP: Logged
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
All times are Central (GMT -6:00)
|
This topic comprises 6 pages: 1 2 3 4 5 6
|
Powered by Infopop Corporation
UBB.classicTM
6.3.1.2
The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion
and agrees to release the authors from any and all liability.
|