Film-Tech Cinema Systems
Film-Tech Forum ARCHIVE


  
my profile | my password | search | faq & rules | forum home
  next oldest topic   next newest topic
» Film-Tech Forum ARCHIVE   » Operations   » Film Handlers' Forum   » Tarantino Gets 50 70mm Projectors For The Hateful Eight (Page 7)

 
This topic comprises 11 pages: 1  2  3  4  5  6  7  8  9  10  11 
 
Author Topic: Tarantino Gets 50 70mm Projectors For The Hateful Eight
Monte L Fullmer
Film God

Posts: 8367
From: Nampa, Idaho, USA
Registered: Nov 2004


 - posted 08-18-2015 11:21 PM      Profile for Monte L Fullmer   Email Monte L Fullmer   Send New Private Message       Edit/Delete Post 
Correction above: I was thinking on Samsung's 1Zb SSD Drive that they came out, which this $8K drive is the Enterprise drive, and got it mixed up with this above 16T drive.

Apologies

-Monte

 |  IP: Logged

Brad Miller
Administrator

Posts: 17775
From: Plano, TX (36.2 miles NW of Rockwall)
Registered: May 99


 - posted 08-18-2015 11:56 PM      Profile for Brad Miller   Author's Homepage   Email Brad Miller       Edit/Delete Post 
I wonder how many people click on this thread expecting a discussion about film. [Razz]

 |  IP: Logged

Amanda Mundin
Expert Film Handler

Posts: 122
From: Belper, Derbyshire, UK
Registered: Sep 2005


 - posted 08-19-2015 10:02 AM      Profile for Amanda Mundin   Email Amanda Mundin   Send New Private Message       Edit/Delete Post 
So how many theatres, if any, are going to be showing Hateful Eight on a larger 2.76:1 screen, i.e. larger than their normal 2.39 image, rather than making the screen smaller to fit the 2.76 ratio?

 |  IP: Logged

Leo Enticknap
Film God

Posts: 7474
From: Loma Linda, CA
Registered: Jul 2000


 - posted 08-19-2015 10:20 AM      Profile for Leo Enticknap   Author's Homepage   Email Leo Enticknap   Send New Private Message       Edit/Delete Post 
The only houses that could show UP70 covering a larger surface area of screen than any other ratio would be ones with a screen and masking specifically designed for UP70 (in other words, with an area left and right that is kept masked when showing 2.36). I don't know of any such houses still in existence. In most cases, the screen itself will be optimized for 2.36, and you could only go wider than that by letterboxing.

Our biggest screen (at the Egyptian) is unusual in that it was designed with "legacy" ratios in mind from the outset, and so the ratio that uses the largest part of its surface area is 2.2:1 5/70. This is obtained by opening all four masking bars all the way. 1.33 (35mm full-gate) and 1.37 also use the full height of the screen. But even we can't show UP70 with a larger image than regular 'scope: for UP70, we have to open the side (vertical) bars all the way, and then adjust the horizontal ones to mask the image. The result is 2.39 minus a letterbox.

 |  IP: Logged

Brian D. Whitish
Expert Film Handler

Posts: 103
From: Seattle, WA, USA
Registered: Apr 2001


 - posted 08-19-2015 01:53 PM      Profile for Brian D. Whitish   Email Brian D. Whitish   Send New Private Message       Edit/Delete Post 
If they use the curved screen at Seattle Cinerama they could do it. I think they will be running Star Wars. How about Cinerama Dome in LA?

 |  IP: Logged

Stephan Shelley
Jedi Master Film Handler

Posts: 854
From: castro valley, CA, usa
Registered: Nov 2014


 - posted 08-19-2015 08:21 PM      Profile for Stephan Shelley   Email Stephan Shelley   Send New Private Message       Edit/Delete Post 
Cinerama Dome can run UP70. Saw Mad Mad Mad World there a few years back and they showed it with a UP lens. I expect that the UP70 image is wider than the normal scope.

 |  IP: Logged

Mark Ogden
Jedi Master Film Handler

Posts: 943
From: Little Falls, N.J.
Registered: Jun 99


 - posted 08-19-2015 08:41 PM      Profile for Mark Ogden   Email Mark Ogden   Send New Private Message       Edit/Delete Post 
Did ArcLight ever settle with I.A.T.S.E. #33? I'd only love to see them try to open this thing in the Dome while some of the best guys in the business are out on Sunset Blvd. with picket signs.

 |  IP: Logged

Leo Enticknap
Film God

Posts: 7474
From: Loma Linda, CA
Registered: Jul 2000


 - posted 08-20-2015 11:35 AM      Profile for Leo Enticknap   Author's Homepage   Email Leo Enticknap   Send New Private Message       Edit/Delete Post 
More news from my contact: apparently the list of 50 venues has not yet been finalized, and BLSI is worried about running out of places to store the gear that they've refurbed and prepared for installation.

This is cutting it really fine. I don't know how many installation teams they're going to deploy when the time comes, but for argument's sake let's say two, and it takes a week per venue (travel to and from, the install and testing, allowing a day or two for unforeseen issues, etc.). That already means February-March before they're done, even if they started right now.

There's no mention of it in the Telluride program, so it looks like that premiere isn't going to happen, either.

If I had to guess, I'd guess that the "50 5/70" release will need at least 3-6 months to make happen after the movie has actually been finished (to the point of an approved answer print), which in turn leads to the guess that we're going to see this pushed back well into next spring.

 |  IP: Logged

Brad Miller
Administrator

Posts: 17775
From: Plano, TX (36.2 miles NW of Rockwall)
Registered: May 99


 - posted 08-20-2015 12:00 PM      Profile for Brad Miller   Author's Homepage   Email Brad Miller       Edit/Delete Post 
If the bookings are able to be finalized, they could possibly ship out the systems and let them sit in the theaters waiting to be installed to help clear storage space. The only problem with this issue is one of shipping damage not being immediately reported.

Surely they will have more than 2 install teams. The concern though is if they will truly give proper time to handle each install like you wrote. None of these installs will be straightforward, as it isn't like a new building. Everything from a second port window to new low voltage and high voltage wiring will have to be dealt with. Even if exhaust is split with dampers, that takes time. If the installs are rushed, then the quality just won't be there. Likewise if they were to subcontract out additional crews that don't have solid 70mm install experience, the quality will suffer.

But it sounds like they have the time if the film isn't going to be completed for Christmas day anyway and delaying the opening would however be the best possible thing for Tarantino's vision.

 |  IP: Logged

Paul H. Rayton
Expert Film Handler

Posts: 210
From: Los Angeles, CA , USA
Registered: Aug 2003


 - posted 08-20-2015 12:27 PM      Profile for Paul H. Rayton     Send New Private Message       Edit/Delete Post 
There will be a lot of rather unhappy people, with associated wringing of hands, if they don't make the December release date, at least somehow. It's called "Academy Awards Qualification", and if QT and/or The Weinstein Co. think they need a boost from such consideration, they're going to HAVE to make that December release date, or just abandon pretty much any hope of awards attention to help sell the picture to those who may not be attracted to the movie by some hype about a wider-than-normal picture size.

 |  IP: Logged

Martin McCaffery
Film God

Posts: 2481
From: Montgomery, AL
Registered: Jun 99


 - posted 08-20-2015 12:34 PM      Profile for Martin McCaffery   Author's Homepage   Email Martin McCaffery   Send New Private Message       Edit/Delete Post 
They only need to get it into one screen for a week to qualify. Maybe they will go full retro and bring back the Road Show. That way, all 50 theatres don't need to be up and ready at once.

 |  IP: Logged

Bobby Henderson
"Ask me about Trajan."

Posts: 10973
From: Lawton, OK, USA
Registered: Apr 2001


 - posted 08-20-2015 01:23 PM      Profile for Bobby Henderson   Email Bobby Henderson   Send New Private Message       Edit/Delete Post 
Even though it has been a tradition in recent decades to release Oscar™-caliber movies in November or December, it's not really necessary. There are plenty of Best Picture Oscar™ winners that weren't released in the late Fall or holiday season.

If any teams need extra time to get this film completed as well as possible in post production and shown as well as possible in theaters then it's really critical to allow the extra time.

If the new 70mm installations are done well they could be used again for other movie releases. There's maybe a couple future 70mm movie possibilities in the works now. Plus, since certain d-cinema camera models are vastly outpacing the max of 4K projectors, 70mm prints are an alternative to show off that extra resolution.

 |  IP: Logged

Leo Enticknap
Film God

Posts: 7474
From: Loma Linda, CA
Registered: Jul 2000


 - posted 08-20-2015 01:32 PM      Profile for Leo Enticknap   Author's Homepage   Email Leo Enticknap   Send New Private Message       Edit/Delete Post 
quote: Martin McCaffery
They only need to get it into one screen for a week to qualify...
In the greater LA area, if I remember the rule correctly. If they'd be looking for a venue ready to go with 5/70, that basically means us (Egyptian or Aero), the Billy Wilder, the Linwood Dunn or the Arclight. I wouldn't have thought UCLA would be interested (and the seating capacity of the Wilder isn't that big, from what I remember, anyway), the Dunn is an Academy-owned theatre, which I'm guessing rules it out for a qualification run, and as has been pointed out, the Arclight is in the midst of a, erm, "little local difficulty".

I guess those of us at the Cinematheque had probably better not arrange any big Christmas family gatherings, then! Hopefully it'll do better business than The Interview last Christmas, even though it's even less of a festive-themed show.

 |  IP: Logged

Paul H. Rayton
Expert Film Handler

Posts: 210
From: Los Angeles, CA , USA
Registered: Aug 2003


 - posted 08-20-2015 01:53 PM      Profile for Paul H. Rayton     Send New Private Message       Edit/Delete Post 
A few other considerations that pertain: the run has to be in a commercial cinema, and one that runs EVERY DAY. On the other hand, a run can be from most any kind of "professional" format, so he/they would need to finalize the cut, and render a DCP from that, which would run for the critical one week somewhere in Los Angeles County. It could be any kind of a location, but the aforementioned retrospective and museum locations are simply not commercial operations, and it won't fly. Quentin could, however, pull it off at his very own little playhouse, the New Beverly -- except there it would have to be 35mm, since they don't believe in DCPs there. Or they can do a hurry-up install of 70mm equipment in there...

 |  IP: Logged

Louis Bornwasser
Film God

Posts: 4441
From: prospect ky usa
Registered: Mar 2005


 - posted 08-20-2015 01:54 PM      Profile for Louis Bornwasser   Author's Homepage   Email Louis Bornwasser   Send New Private Message       Edit/Delete Post 
From what I get from unspoken comments, it is easy to "drop a console" and wire it in. Same for the platter. The digital model shows what can be done in a few hours. If I were in charge, I would then follow with a picture only crew that would oil up the projector, align the film path, file the plate and then send a sound tech later. Optimistically 1 day plus travel each could make you operational.

In the 35mm days, I prefabbed the consoles, dropped 7 in place, wired all afternoon, and then had usable picture by noon the next day. 3 man crew then filed plates. 3 men, 2 days: picture and film alignment was finished. I went back the next day alone and connected and tuned the sound. (A chains were prefabricated.)

Think in terms of 3 individuals on a circuit. Heavy lifting, as always, to be done by the theatre or contract movers.

Yes, I know about travel time, but 3-4 per week per crew is not unreasonable. We know that from digital installs.

 |  IP: Logged



All times are Central (GMT -6:00)
This topic comprises 11 pages: 1  2  3  4  5  6  7  8  9  10  11 
 
   Close Topic    Move Topic    Delete Topic    next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:



Powered by Infopop Corporation
UBB.classicTM 6.3.1.2

The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion and agrees to release the authors from any and all liability.

© 1999-2020 Film-Tech Cinema Systems, LLC. All rights reserved.