|
|
|
|
Author
|
Topic: Tarantino Gets 50 70mm Projectors For The Hateful Eight
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Leo Enticknap
Film God

Posts: 7474
From: Loma Linda, CA
Registered: Jul 2000
|
posted 08-20-2015 11:35 AM
More news from my contact: apparently the list of 50 venues has not yet been finalized, and BLSI is worried about running out of places to store the gear that they've refurbed and prepared for installation.
This is cutting it really fine. I don't know how many installation teams they're going to deploy when the time comes, but for argument's sake let's say two, and it takes a week per venue (travel to and from, the install and testing, allowing a day or two for unforeseen issues, etc.). That already means February-March before they're done, even if they started right now.
There's no mention of it in the Telluride program, so it looks like that premiere isn't going to happen, either.
If I had to guess, I'd guess that the "50 5/70" release will need at least 3-6 months to make happen after the movie has actually been finished (to the point of an approved answer print), which in turn leads to the guess that we're going to see this pushed back well into next spring.
| IP: Logged
|
|
|
|
|
|
|
|
|
|
Leo Enticknap
Film God

Posts: 7474
From: Loma Linda, CA
Registered: Jul 2000
|
posted 08-20-2015 01:32 PM
quote: Martin McCaffery They only need to get it into one screen for a week to qualify...
In the greater LA area, if I remember the rule correctly. If they'd be looking for a venue ready to go with 5/70, that basically means us (Egyptian or Aero), the Billy Wilder, the Linwood Dunn or the Arclight. I wouldn't have thought UCLA would be interested (and the seating capacity of the Wilder isn't that big, from what I remember, anyway), the Dunn is an Academy-owned theatre, which I'm guessing rules it out for a qualification run, and as has been pointed out, the Arclight is in the midst of a, erm, "little local difficulty".
I guess those of us at the Cinematheque had probably better not arrange any big Christmas family gatherings, then! Hopefully it'll do better business than The Interview last Christmas, even though it's even less of a festive-themed show.
| IP: Logged
|
|
Paul H. Rayton
Expert Film Handler
Posts: 210
From: Los Angeles, CA , USA
Registered: Aug 2003
|
posted 08-20-2015 01:53 PM
A few other considerations that pertain: the run has to be in a commercial cinema, and one that runs EVERY DAY. On the other hand, a run can be from most any kind of "professional" format, so he/they would need to finalize the cut, and render a DCP from that, which would run for the critical one week somewhere in Los Angeles County. It could be any kind of a location, but the aforementioned retrospective and museum locations are simply not commercial operations, and it won't fly. Quentin could, however, pull it off at his very own little playhouse, the New Beverly -- except there it would have to be 35mm, since they don't believe in DCPs there. Or they can do a hurry-up install of 70mm equipment in there...
| IP: Logged
|
|
Louis Bornwasser
Film God

Posts: 4441
From: prospect ky usa
Registered: Mar 2005
|
posted 08-20-2015 01:54 PM
From what I get from unspoken comments, it is easy to "drop a console" and wire it in. Same for the platter. The digital model shows what can be done in a few hours. If I were in charge, I would then follow with a picture only crew that would oil up the projector, align the film path, file the plate and then send a sound tech later. Optimistically 1 day plus travel each could make you operational.
In the 35mm days, I prefabbed the consoles, dropped 7 in place, wired all afternoon, and then had usable picture by noon the next day. 3 man crew then filed plates. 3 men, 2 days: picture and film alignment was finished. I went back the next day alone and connected and tuned the sound. (A chains were prefabricated.)
Think in terms of 3 individuals on a circuit. Heavy lifting, as always, to be done by the theatre or contract movers.
Yes, I know about travel time, but 3-4 per week per crew is not unreasonable. We know that from digital installs.
| IP: Logged
|
|
|
|
All times are Central (GMT -6:00)
|
This topic comprises 11 pages: 1 2 3 4 5 6 7 8 9 10 11
|
Powered by Infopop Corporation
UBB.classicTM
6.3.1.2
The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion
and agrees to release the authors from any and all liability.
|