|
|
|
|
Author
|
Topic: Hey you, you suck! (AKA: Outing bad film handlers) Part 2
|
|
|
John Hawkinson
Film God

Posts: 2273
From: Cambridge, MA, USA
Registered: Feb 2002
|
posted 05-09-2007 09:59 PM
What's wrong with splicing some one-sided and others two-sided? I admit, I don't see why you'd do this, but it doesn't seem that it rises to the level of "suck." At least you'll annoy the changeover and platter people equally. Kind of like splitting the difference. I guess I could see 2-sided on heads and 1-sided on tails, but it's a stretch.
Get yourself a good solvent, Chris. Try VM&P Naptha, or Filmguard, or 1,1,1-tricholorethane if you have it. Even alcohol in a pinch. It'll really help to get the nasty tape off.
--jhawk
| IP: Logged
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Chad M Calpito
Master Film Handler
Posts: 435
From: San Diego, CA
Registered: Apr 2006
|
posted 05-11-2007 11:49 PM
In answer to your query, Brad, it wasn't a tape splice. It was a lab splice. What's unusual was the fact that there was no reel header and a frame was cut in half, including the length of the sprocket hole damage. Which makes me wonder why this occured. This is the first time I've ever encountered something like this. Luckily, the 3rd reel for the most part (99%) of it was undamaged.
Anyway, you could be right though, Brad, that it may not be DFS fault, but, the Lab themselves. Whoever did a sloppy job, Sucks!
| IP: Logged
|
|
|
|
Bruce McGee
Phenomenal Film Handler

Posts: 1776
From: Asheville, NC USA... Nowhere in Particular.
Registered: Aug 1999
|
posted 06-10-2007 09:30 PM
I am running a bunch of free films this summer. The first two, Wallace and Gromit (Were Rabbit) and Flushed Away showed up this week.
Last night, I built them onto the platters.
I figgered that after all of the griping on these forums about improper film handling that somehow films would be in better shape when I get them. Wrong again.
I found the head and tail leaders all tangled up in the bottom of the box for Flushed Away, along with a load of trailers wound onto the head of reel one, which was wound backwards on the reel.
I did get a fairly nice threading leader for my theatre out of this.
As for Wallace And Gromit, there is shoe polish allover the heads and tails of each reel, and the print has tail-wrapped several times. MANY opaque tape splices in the film, too.
One gripe, they cut the MPAA rating leader for no reason, and put their ID allover the rest of the rating. Nice gooey tape. I got it off the print, but am not looking forward to seeing it on the screen.
Both of the prints had masking tape holding the ends down. Someone at DeLuxe used white tape to re-tape down the film end, but they didnt bother to remove the gobs of old tape before applying new tape. What a mess.
I guess this is a sample of the way things will be this summer at the movies. I'm glad I like inspecting films thoroughly. It took longer to inspect them than their total run time!
At least, when these films go back, they will be in good shape.
| IP: Logged
|
|
Thomas Pitt
Master Film Handler

Posts: 266
From: Leeds, West Yorkshire, UK
Registered: May 2007
|
posted 06-11-2007 12:26 AM
In the UK, most trailers are supplied with a short 'header' displaying the BBFC rating of the trailer (U, PG, 12 etc) for a few seconds before the actual trailer starts. It's equivalent to the MPAA green screen showing that the trailer is approved. For some reason, both of the Vue cinemas I go to tend to cut these off and just have the trailers running back to back. Big mistake!
Cutting off the BBFC rating also affects the soundtrack, which is read a bit further along the film. You often see the trailer start, then about 1.5 seconds later the sound suddenly cuts in.
I assume they cut off the BBFC ratings because they have their own card "The following trailers are appropriate to the feature certificate" that's shown before the trailer reel starts.
Do any other UK cinemas do this?
Also, putting aside equipment failure (like the Opticue one I mentioned in another topic), the main problem I've seen is starting out of frame. At one of the Vue cinemas, the procedure is to do manual starts whenever possible and watch the screen - so the focus and framing can be adjusted if necessary. There's something... disconcerting... about the first advert (or trailer notice) moving up and down like a TV with bad sync.
Whoever spliced together the print of Bridge to Terabithia I saw - you suck! Making the first splice in mid-frame so that it throws the rest of the movie out of frame; I can imagine there were many unhappy customers! [ 06-11-2007, 03:21 PM: Message edited by: Thomas Pitt ]
| IP: Logged
|
|
|
|
|
Powered by Infopop Corporation
UBB.classicTM
6.3.1.2
The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion
and agrees to release the authors from any and all liability.
|