Film-Tech Cinema Systems
Film-Tech Forum ARCHIVE
Topic Closed  Topic Closed


  
my profile | my password | search | faq & rules | forum home
  next oldest topic   next newest topic
» Film-Tech Forum ARCHIVE   » Operations   » Film Handlers' Forum   » Hey you, you suck! (AKA: Outing bad film handlers) (Page 35)

 
This topic comprises 100 pages: 1  2  3  ...  32  33  34  35  36  37  38  ...  98  99  100 
 
Author Topic: Hey you, you suck! (AKA: Outing bad film handlers)
Brad Miller
Administrator

Posts: 17775
From: Plano, TX (36.2 miles NW of Rockwall)
Registered: May 99


 - posted 03-30-2004 05:04 AM      Profile for Brad Miller   Author's Homepage   Email Brad Miller       Edit/Delete Post 
Bryan, if you think that every reel that the labs turn out is perfect and without defects, you really need to wake up. A professional will pre-screen EVERY print in it's entirity so that the film may be evaluated for presentation quality standards before the paying customers see it. When defects are found, those reels should be ordered from the studio and replaced. There is no legitimate excuse not to do this. It's part of the job.

You may think you are some kind of superior projectionist because you can count to six, but I've got news for you, putting the reels in order and in frame is nothing. If you don't screen your prints, your presentation is simply not up to what it could be. I usually have to reject at least 1 reel a month, sometimes as many as several due to unacceptable sloppy lab work. I find it hard to imagine that your theater miraculously receives flawless prints every week. If you really believe that, then your quality standards need to be raised, because you won't have many friends here with that kind of attitude. It's not a race. It's about putting on the best presentation possible.

While I'm thinking about it, reattaching the leaders with a double sided tape splice is not the proper way to do it. This has been discussed to great lengths before and the vast majority vote is to single side tape splice the leaders back on. This way should that print end up running it's next performance in a reel to reel house, it *could* be ran straight out of the cans (although most reel to reel houses would lay a piece of tape on the other side of the splice just to make sure). However since almost every theater runs platters, the overwhelming odds are that the next theater will need to disassemble your double sided splice. It doesn't take a rocket scientist to realize that peeling the tape off from a single sided splice is many times easier than peeling the tape off from a double sided splice. The result is that most people are lazy and/or rushed, meaning that your double sided splices will in all probability end up in another frame getting chopped off of the head of each reel instead of being preserved. You are not doing anyone a favor by making double sided splices upon shipout. Do a search.

In reference to Daryl's comment, I have received many odd things over the years. Everything from an reel that 3-4 minutes into it started over to having one subtitled reel within a normal feature (brand new print by the way) to a different language soundtrack on one reel (again, brand new print) to a menagerie of lab issues ranging from picture issues to a complete extended length dropout of digital audio. The labs are not perfect. You are there to catch their mistakes and there are a lot of things that simply cannot be caught on the bench 100% of the time.

 |  IP: Logged

Daryl C. W. O'Shea
Film God

Posts: 3977
From: Midland Ontario Canada (where Panavision & IMAX lenses come from)
Registered: Jun 2002


 - posted 03-30-2004 05:11 AM      Profile for Daryl C. W. O'Shea   Author's Homepage   Email Daryl C. W. O'Shea   Send New Private Message       Edit/Delete Post 
Nope, it didn't have anything written on the sound track leader. Which is why I screened it in the first place, since I didn't normally screen everything 10 years ago.

I've had one other that had the wrong sound track but that one did have the title, formats and date on it.

 |  IP: Logged

Darryl Spicer
Film God

Posts: 3250
From: Lexington, KY, USA
Registered: Dec 2000


 - posted 03-30-2004 09:32 AM      Profile for Darryl Spicer     Send New Private Message       Edit/Delete Post 
quote:
Some of you will say well I have to run the feature to make sure it is OK, Then you are not a good projectionist.

I disagree with that....Nobody is perfect and the reason you screen it is not to check yourself but to make sure there are no unforseen problems with the print like lab errors or soundtrack errors that will give the customers less than satisfactory presentations. I used to personally screen every print I put together not to check my self but to make sure nothing was wrong with the presentation. I have found many problems that will not present themselves on visual inspection of prints.

 |  IP: Logged

Jeremy Fuentes
Mmmm, Dr. Pepper!

Posts: 1168
From: Corpus Christi, TX United States
Registered: Jan 2004


 - posted 03-30-2004 09:41 AM      Profile for Jeremy Fuentes   Email Jeremy Fuentes   Send New Private Message       Edit/Delete Post 
Bryan, did you not read all the previous posts to see why we screen prints ahead of time, or did you just decide that you are perfect and we are all beneath you.

 |  IP: Logged

Steve Kraus
Film God

Posts: 4094
From: Chicago, IL, USA
Registered: May 2000


 - posted 04-09-2004 04:52 PM      Profile for Steve Kraus     Send New Private Message       Edit/Delete Post 
Kill Bill Vol 2 Release print 27.

Came from Springfield, IL per the driver. Usual complaints of bands missing, masking taped on leaders, and the fadeouts cropped out of their platter build. Of course they know more about how the film should look than Quentin!

 |  IP: Logged

Steve Kraus
Film God

Posts: 4094
From: Chicago, IL, USA
Registered: May 2000


 - posted 04-16-2004 08:55 PM      Profile for Steve Kraus     Send New Private Message       Edit/Delete Post 
Secret Things (First Run Features)

Shipped to me directly from Univ of NM / Southwest Film Center which played it April 8-11.

Received with leaders hung on with masking tape, almost all on the wrong reels. Thank God the first platter-er left check frames which not only revealed the problem but allowed for its correction or the screening would have been cancelled.

Reels 6 & 7 left tied with leaders rolled up in bottom of shipping box. No empty reel so after straightening out this mess that roll is going to have to travel on a core.

Not that only platter people screw up prints. Whoever cued this print spaced the cues completely wrong and this varied from reel to reel. Another C/O operator decided to add new motor cues a few frames before the original. Bzzt wrong....the spacing from first motor cue to C/O cue is still non standard. Only way to run this properly without adding to visual clutter is to measure the spacing and adjust the threadup of the following reel. I've labeled them to make it easier for the next person. 6 frames short, 10 frames short, 4 frames too long, etc.

If only I could charge extra! [Roll Eyes]

 |  IP: Logged

Frank Angel
Film God

Posts: 5305
From: Brooklyn NY USA
Registered: Dec 1999


 - posted 04-18-2004 07:12 AM      Profile for Frank Angel   Author's Homepage   Email Frank Angel   Send New Private Message       Edit/Delete Post 
I've had the luxury of running single screens. I always try to screen prints before there is an audience, but I would say this happens less times than more. It is not so much because of late print arrival, but rather that the exhibitor cannot afford to pay me twice the time for the show he is running; so at best I get to spot checking a reel or two. On the other hand, in art houses, the need to see if a sound track is missing or one reel has some weird printing error that makes it un-runable is very rare because the print has been run before. Any lab problems that you might encounter in a first-run, right-out-of-the-can-from-the-lab print have already been encountered by the guy before you and, hopefully by the time you get it, have been addressed and corrected by the distributor. At the very least, there will be a projectionist's note in the can about it. Bottom line, I rarely get to do the prescreening run that you first run multiplex guys get to do. And from what you are saying here, prescreening is essential for good presentation, at least in first run houses. Brad says:
quote:
A professional will pre-screen EVERY print in it's entirety so that the film may be evaluated for presentation quality standards before the paying customers see it.
But then I got to thinking about the various single screens I work in, and I realized that the biggest drawback is money -- none of my employers would ever agree to paying me for the extra time that a full prep screening would entail. So, you guys in a multiplex situation....if you have an average of say 12 screens and let's say the average run time of a print is about 100 minutes, then when do you get the time to prescreen all these prints? And do you mean to tell me that the cost-conscious (read cheap) exhibitor is willing to pay his projectionist for a complete throwaway show for EVERY new title that comes in? That adds up to a significant amount of hours per week he's paying for on which he gets zero return. And then more pointedly, when do you get to do these prescreenings? From what I have been reading here, many times you barely have time to get the print on the platter in time for the first show. So when does all this prescreening take place? It would have to be into the wee hours of the night, no? I just can't picture it, but would be happy if someone could explain it to me when you are opening 5 or 6 new titles on a Friday night and the prints all come in on Thursday.

And also, who does the evaluation of the print at the prescreening? Is it the same high school kid that runs the booth when the projectionist isn't there? What good will that do? Seems if you rely on that method of evaluation, you might get just as much helpful information from hand inspecting the print on the rewind bench....maybe more.

Oh, and PS, I have a few projectionist friends that work here in Brooklyn and Manhattan and not one of them to a person says he's ever been told to prescreen new prints and certainly doesn't know when this would be done if he did. The only exception being special first run sneaks where studio executives are present or for press screenings, and even then, many times the studio will not pay the rental time in the theatre for a prescreening as was the now-famous case of the press screening of STAR TREK in the Astor Plaza in Manhattan.

The projectionist who made up the print the night before put two reels out of order. The morning shift guy comes in and runs it....no prescreening ordered or performed. Needless-to-say he got the brunt of the firestorm that followed. A prescreening would have caught it, but Paramount didn't pay for one.

So clue me in on how prescreenings work.

 |  IP: Logged

Zach McQuaid
Film Handler

Posts: 37
From: Erie, Pennsylvania, USA
Registered: Sep 2000


 - posted 04-18-2004 09:10 AM      Profile for Zach McQuaid   Email Zach McQuaid   Send New Private Message       Edit/Delete Post 
The following is an example of a high-end opening weekend, so we're talking a ludicrous amount (6) prints with this recent, real life example.

Thursday afternoon (noon-1:00ish) - 3 prints arrive. They are all built up usually before 6pm. 2 people work during this time, generally one to buildup and the other runs the booth. At closing time (around 1am after the last movie lets out) and everything else is done like prints moved, trailers reprogrammed, etc. the closing projectionists and certain competent managers, and myself begin screening the prints. Without problems, we're done screening around 3-3:30am.

Everyone except me and my Friday morning guy goes home, at which point we begin building up the three prints that have arrived while we were screening the first three. First show is at noon, so we have a good 8 hours to build and screen 3 prints. Done.

As far as the $$$ goes, well it costs on average of between $15 - $30 to screen each movie, depending on wage of projectionist and/or manager. Total cost from noon Thursday when the prints get there until noon Friday when the first show starts = $453.00. $249 of that is just screening. It takes 90 patrons to cover that at $5 a ticket. (Around here, anyway!)
-------------------------
Projection Manager
Cinemark USA, Inc.
Movies 17
Erie, PA

 |  IP: Logged

Darryl Spicer
Film God

Posts: 3250
From: Lexington, KY, USA
Registered: Dec 2000


 - posted 04-18-2004 10:34 AM      Profile for Darryl Spicer     Send New Private Message       Edit/Delete Post 
Back in the 80's early 90's I used to screen everything personally. We got our films in on Wednesday then so I could screen a couple Wednesday night and Thursday night. I had keys to the building so I was usually the only one there. Now days, I am lucky if I get one in but I do have competent people in booth that will let me know when there is a problem. For the first time in a long time I watched two back to back last week.

 |  IP: Logged

Bill Gabel
Film God

Posts: 3873
From: Technicolor / Postworks NY, USA
Registered: Jan 2002


 - posted 04-19-2004 12:32 PM      Profile for Bill Gabel   Email Bill Gabel   Send New Private Message       Edit/Delete Post 
When we would do studio screenings in theatres outside of the studio lot. We would do a tech-run through of the film. Plus we would have Dolby come in a do a complete sound check of the sound system in that theatre. The projectionist would a studio call rate for that time. So if you were to do the run through and evening show the operator got two studio calls. (each call was $240.00) And depending if the screening was a double-system show, then you would employ an operator for the track and a fader man. That would be for the evening show only. In Hollywood and Westwood the Studio's would do a run through on high profile films and the projectionist would get a studio rate for that one screening.

 |  IP: Logged

Tony Bandiera Jr
Film God

Posts: 3067
From: Moreland Idaho
Registered: Apr 2004


 - posted 04-19-2004 08:39 PM      Profile for Tony Bandiera Jr   Email Tony Bandiera Jr   Send New Private Message       Edit/Delete Post 
Years ago found box staples [Eek!] in reel 5 of a 70mm print of Branaugh's "Hamlet"..good thing I decided to inspect each reel as it was winding onto the platter..the chief projectionist was laughing at me for doing it till I hit those staples [Razz] ..imagine the damage to the Norelco AA if those had hit..not to mention the additional damage to the print!

 |  IP: Logged

Scott Norwood
Film God

Posts: 8146
From: Boston, MA. USA (1774.21 miles northeast of Dallas)
Registered: Jun 99


 - posted 05-01-2004 08:59 PM      Profile for Scott Norwood   Author's Homepage   Email Scott Norwood   Send New Private Message       Edit/Delete Post 
Hey, you at the Chicago Film Festival (or whoever sent a print of "Cuba Libre" also known as "Dreaming of Julia" to the "Providence Festival of New Latin American Cinema" or whatever they're calling it this week), you suck!

Not only did you use a) masking tape (with flipped leaders) and b) copious amounts of shoepolish, but you plattered this nearly-new print and then broke it down incorrectly, leaving the last dozen or so feet of R2 attached to the head of R3. Did you really have that much difficulty finding the reel change splice even with the shoepolish and zebra tape? [Roll Eyes]

 |  IP: Logged

Steve Kraus
Film God

Posts: 4094
From: Chicago, IL, USA
Registered: May 2000


 - posted 05-02-2004 01:32 AM      Profile for Steve Kraus     Send New Private Message       Edit/Delete Post 
The 20th annual Latino Film Festival was held here recently.
Looks like that title played at the Biograph Theatre.

 |  IP: Logged

Joe Schmidt
Expert Film Handler

Posts: 172
From: Billings, Montana, USA
Registered: Apr 2001


 - posted 05-02-2004 04:23 AM      Profile for Joe Schmidt   Email Joe Schmidt   Send New Private Message       Edit/Delete Post 
[Confused] [Confused] [Confused]

Of course Brad is right, above, but theory, even if correct, cannot work in this world of cheapskate exhibitors. I would very cautiously allege that if we are building up a brand new print from the lab onto a platter, which has original leaders & tails intact, we are probably safe in going without a preview, especially for major releases from distinguished directors, such as "Cannibal Girls From The Tar Pits."

My practice many years ago was to leave four frames at the leader & tail when making up a new print to 6000' reels, or 13,000' in the case of Cinemecchanica, which would be a platter equivalency today. This is a safety, and enables the next house getting the print to be sure reels aren't mixed up. This is more important than trying to project every single frame of the print. Remember, back in the changeover days the switch between projectors was a slightly imperfect process anyway because humans aren't machines. And yes, the leaders & tails should be reattached with just a single tape splice on one side.

At the risk of being flamed, I will even allege that putting them on with masking tape for mass-release features like Cannibal Girls will do no harm since platters have become nearly universal everywhere. Should the film go to a single dual-projector house, as a practical matter it's almost a certainty the projectionist here will check the film.

As to cheapskate studios that won't pay for the time to do a test run before invited guests at a sneak preview or important screening: well the matter is out of our hands and they deserve everything that happens to them. Given the costs to make a film this is insanity. I once invited a director to come up to the booth with me and double check with me to ensure we had all the reels in correct order. He was very appreciative, and a friend was made.

 |  IP: Logged

Carl Martin
Phenomenal Film Handler

Posts: 1424
From: Oakland, CA, USA
Registered: Feb 2002


 - posted 05-02-2004 04:42 AM      Profile for Carl Martin   Author's Homepage   Email Carl Martin   Send New Private Message       Edit/Delete Post 
uh oh...

ok, i'll start. first of all, how will 4 ID frames be any more useful than 1? losing a 1/3 second chunk of the film certainly can obliterate whole words. just yesterday i saw a film with dialogue over the reel change. the opaque splice caused a blip but fortunately there were subtitles.

almost all masking tape leaves residue. i have seen some that didn't, at least in the amount of time that it had to set, but i didn't apply it so i don't know what brand it was. personally, i could tolerate heads and tails attached with artist's tape, as long as the edges lined up and all that, which is one of the things a splicer is designed to do anyways.

carl

 |  IP: Logged



All times are Central (GMT -6:00)
This topic comprises 100 pages: 1  2  3  ...  32  33  34  35  36  37  38  ...  98  99  100 
 
   Open Topic    Move Topic    Delete Topic    next oldest topic   next newest topic
 - Printer-friendly view of this topic
Hop To:



Powered by Infopop Corporation
UBB.classicTM 6.3.1.2

The Film-Tech Forums are designed for various members related to the cinema industry to express their opinions, viewpoints and testimonials on various products, services and events based upon speculation, personal knowledge and factual information through use, therefore all views represented here allow no liability upon the publishers of this web site and the owners of said views assume no liability for any ill will resulting from these postings. The posts made here are for educational as well as entertainment purposes and as such anyone viewing this portion of the website must accept these views as statements of the author of that opinion and agrees to release the authors from any and all liability.

© 1999-2020 Film-Tech Cinema Systems, LLC. All rights reserved.